Examples of Construction Budget in a sentence
Contractor shall compare their cost estimate with the cost estimate independently prepared by the Architect/Engineer for these same design documents and endeavor to resolve discrepancies in the estimates to the satisfaction of the AOC, and with the goal that both cost estimates are less than or equal to the AOC’s Construction Budget.
Authorization to proceed with each succeeding step in the design process is contingent upon the AOC’s written Acceptance of both the Architect/Engineer’s and Contractor’s independent cost estimates, which when evaluated separately, must both be equal to or less than the Construction Budget.
Contractor shall recommend, if necessary, appropriate modifications of the Design Documents to lower both the Contractor’s and the Architect/Engineer’s independent estimates to amounts equal to or lower than the Construction Budget.
Owner’s Advisor will establish an updated Owner’s Construction Budget (Budget) based on the CM/GC’s procurement strategy which identifies Work Packages used to construct the Work.
The Owner, Owner’s Advisor, and Engineer (collectively, Owner’s Project Team or OPT) will work with CM/GC to determine if rebidding or restructuring Work Packages is likely to lead to lower bid prices; if so determined, CM/GC will rebid selected original Work Packages or restructured Work Packages identified as having the potential to reduce the overall cost of construction to the Owner’s Construction Budget.