Upgrading Culverts Sample Clauses

Upgrading Culverts. PacifiCorp shall, in consultation with the USDA-FS, BLM, and ODFW, complete an inventory of culverts on Project lands as part of the TMP. The inventory shall indicate which culverts require modifications to allow fish passage and which culverts require modifications to pass a 100-year flood. For culverts requiring modifications for fish passage barriers, PacifiCorp shall upgrade such culverts commencing after the New License becomes final at a rate of approximately 20 percent of such culverts a year, to be completed by the fifth anniversary of the New License. The standard for improvements for fish passage shall be the standards of ODFW as set forth in Schedule 15.6 . PacifiCorp shall consult with ODFW to consider any subsequent changes to such design criteria and shall incorporate such changes, provided the costs are not more than 125 percent of existing designs as of the Effective Date as adjusted for inflation. The cost of upgrading culverts shall be allocated on the same basis as costs for road maintenance set forth in Sections 15.2 and 15.3 above for each such road. Inventoried culverts re xxxxxxx upgrading to accommodate a 100-year flood will be upgraded by the eleventh anniversary of a New License at an average rate of approximately 7.5 percent of such culverts per year. PacifiCorp shall replace or upgrade culverts that are associated with other PM&E Measures at the time of scheduled implementation of the said measure. If the USDA-FS cannot fund its share of costs on culverts in any year, the schedule for work on such culverts shall be adjusted to accommodate the funds available.
AutoNDA by SimpleDocs

Related to Upgrading Culverts

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Compaction of surfaces 5 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density. m2 96

  • Compatibility 1. Any unresolved issue arising from a mutual agreement procedure case otherwise within the scope of the arbitration process provided for in this Article and Articles 25A to 25G shall not be submitted to arbitration if the issue falls within the scope of a case with respect to which an arbitration panel or similar body has previously been set up in accordance with a bilateral or multilateral convention that provides for mandatory binding arbitration of unresolved issues arising from a mutual agreement procedure case.

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Compaction 11.1 Concrete shall be thoroughly compacted and fully worked around the reinforcement, around embedded fixtures and into corners of the formwork.

Time is Money Join Law Insider Premium to draft better contracts faster.