Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.
BRAND NAME OR EQUALS/DEVIATIONS Unless otherwise specified, the mention of a particular manufacturer’s brand name or number in the specifications does not imply that this particular good is the only one that will be considered for purchase. This reference is intended solely to designate the type or quality of good that will be acceptable. Equal offers will be considered and must include descriptive literature and/or specifications. Failure to provide descriptive literature and/or specifications with equal offers will result in the disqualification of the bid. The determination as to whether any alternate good or service is or is not equal shall be made solely by the County and such determination shall be final and binding upon all bidders. The County reserves the right to request and review additional information to make such a determination. Although the County provides for the consideration of alternate bids, it reserves the right to make an award in the best interest of the County. Award may not necessarily be given to the lowest bid offered. The Bidder shall be responsible for reading very carefully, and understanding completely, the requirements and the specifications of the items bid upon. Unless the bid is in response to a “Brand Name or Equal” requirement, deviations from the specifications will only be considered if requested in writing prior to the date and time specified for receipt of bids. Deviations, if accepted, will be specifically addressed in writing via an addendum to this Invitation for Bids. Any goods or services that are not in compliance with the specifications will not be accepted.
Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.
Mail Order Catalog Warnings In the event that, the Settling Entity prints new catalogs and sells units of the Products via mail order through such catalogs to California consumers or through its customers, the Settling Entity shall provide a warning for each unit of such Product both on the label in accordance with subsection 2.4 above, and in the catalog in a manner that clearly associates the warning with the specific Product being purchased. Any warning provided in a mail order catalog shall be in the same type size or larger than other consumer information conveyed for such Product within the catalog and shall be located on the same display page of the item. The catalog warning may use the Short-Form Warning content described in subsection 2.3(b) if the language provided on the Product label also uses the Short-Form Warning.
Job Evaluation The work of the provincial job evaluation steering committee (the JE Committee) will continue during the term of this Framework Agreement. The objectives of the JE Committee are as follows: • Review the results of the phase one and phase two pilots and outcomes of the committee work. Address any anomalies identified with the JE tool, process, or benchmarks. • Rate the provincial benchmarks and create a job hierarchy for the provincial benchmarks. • Gather data from all school districts and match existing job descriptions to the provincial benchmarks. • Identify the job hierarchy for local job descriptions for all school districts. • Compare the local job hierarchy to the benchmark-matched hierarchy. • Develop a methodology to convert points to pay bands - The confirmed method must be supported by current compensation best practices. • Identify training requirements to support implementation of the JE plan and develop training resources as required. Once the objectives outlined above are completed, the JE Committee will mutually determine whether a local, regional or provincial approach to the steps outlined above is appropriate. It is recognized that the work of the committee is technical, complicated, lengthy and onerous. To accomplish the objectives, the parties agree that existing JE funds can be accessed by the JE committee to engage consultant(s) to complete this work. It is further recognized that this process does not impact the established management right of employers to determine local job requirements and job descriptions nor does this process alter any existing collective agreement rights or established practices. When the JE plan is ready to be implemented, and if an amendment to an existing collective agreement is required, the JE Committee will work with the local School District and Local Union to make recommendations for implementation. Any recommendations will also be provided to the Provincial Labour Management Committee (PLMC). As mutually agreed by the provincial parties and the JE Committee, the disbursement of available JE funds shall be retroactive to January 2, 2020. The committee will utilize available funds to provide 50% of the wage differential for the position falling the furthest below the wage rate established by the provincial JE process and will continue this process until all JE fund monies at the time have been disbursed. The committee will follow compensation best practices to avoid problems such as inversion. The committee will report out to the provincial parties regularly during the term of the Framework Agreement. Should any concerns arise during the work of the committee they will be referred to the PLMC. Create a maintenance program to support ongoing implementation of the JE plan at a local, regional or provincial level. The maintenance program will include a process for addressing the wage rates of incumbents in positions which are impacted by implementation of the JE plan. The provincial parties confirm that $4,419,859 of ongoing annual funds will be used to implement the Job Evaluation Plan. Effective July 1, 2022, there will be a one-time pause of the annual $4,419,859 JE funding. This amount has been allocated to the local table bargaining money. The annual funding will recommence July 1, 2023.
Apple and Android Devices The following terms apply when you use a mobile application obtained from either the Apple Store or Google Play (each an “App Distributor”) to access the Site:
Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.
Posting licensed content on any Website The following terms and conditions apply as follows: Licensing material from an Elsevier journal: All content posted to the web site must maintain the copyright information line on the bottom of each image; A hyper-text must be included to the Homepage of the journal from which you are licensing at xxxx://xxx.xxxxxxxxxxxxx.xxx/science/journal/xxxxx or the Elsevier homepage for books at xxxx://xxx.xxxxxxxx.xxx; Central Storage: This license does not include permission for a scanned version of the material to be stored in a central repository such as that provided by Heron/XanEdu. Licensing material from an Elsevier book: A hyper-text link must be included to the Elsevier homepage at xxxx://xxx.xxxxxxxx.xxx . All content posted to the web site must maintain the copyright information line on the bottom of each image.
Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.
Usage Statistics The Distributor shall ensure that the Publisher will provide access to both composite system-wide use data and itemized data for the Licensee, the Participating Institutions, individual campuses and labs, on a monthly basis. The statistics shall meet or exceed the most recent project Counting Online Usage of NeTworked Electronic Resources ("COUNTER") Code of Practice Release,3 including but not limited to its provisions on customer confidentiality. When a release of a new COUNTER Code of Practice is issued, the Distributor shall ensure that the Publisher will comply with the implementation time frame specified by COUNTER to provide usage statistics in the new standard format. It is more than desirable that the Standardized Usage Statistics Harvesting Initiative (SUSHI) Protocol4 is available for the Licensee to harvest the statistics.