Vapor Control System Field Survey Standard Operating Procedure (SOP Sample Clauses

Vapor Control System Field Survey Standard Operating Procedure (SOP. [COMPANY] shall prepare a written SOP establishing how it will conduct its Vapor Control System field surveys under this Agreement. The SOP must be submitted to EPA for review and comment 60 Days after the Effective Date and shall include:
AutoNDA by SimpleDocs

Related to Vapor Control System Field Survey Standard Operating Procedure (SOP

  • Standard Operating Procedures Over approximately the past eight years, the Parties have been supplying select Products to one another for use in the operation of their respective businesses within the United States of America, Canada and Mexico. The Parties developed and been following certain standard operating procedures in connecting with, among other topics, forecasting, production planning, ordering, delivering and resolving claims on the Products supplied to one another (the “Current SOPs”). The Parties will be updating their respective business systems over the next six months, and the updates to these business systems will require the Parties to modify the Current SOPs. Once the Parties have completed the updates to the business systems and agreed on the necessary modifications to the Current SOPs, the Parties will sign a written amendment to this Agreement appending the updated standard operating procedures (the “Updated SOPs”). Until the Parties have signed a written amendment appending the Updated SOPs, the parties will continue to follow the Current SOPs. The Parties will comply with the applicable SOPs in connection with the purchase and sale of products identified in a Purchase Schedule. The Parties may add terms and conditions to, and amend the terms and conditions of, the SOP in a Purchase Schedule, but any additional and amended terms and conditions in a Purchase Schedule supplementing and modifying the SOP will only apply the specific products identified in that Purchase Schedule for its duration.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant-assisted project in accordance with Section 287.057, Florida Statutes.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

Time is Money Join Law Insider Premium to draft better contracts faster.