WATER LINE. A requirement that Developer install a 16" water line. The Development only requires a 12" water line, but the Town has requested a 16" water line. The Town shall pay for the cost of the upsizing to 16", provided that Developer, prior to construction, shall obtain: a bid from its preferred contractor for construction and installation of the 12" water line; and a bid from its preferred contractor for construction and installation of the 16" water line. The fractional increase between the two bids shall be used to determine the Town's pro rata share of the actual costs to install the 16" water line.
Appears in 1 contract
Samples: Annexation Agreement