Watermains. (a) The Owner shall connect to the existing watermain system for the purpose of servicing the Lands in accordance with the design, plans and specifications approved by the Director of Operations. (b) Upon completion of the Primary Services, prior to any financial release and prior to connecting to the Town's existing watermain system, the Owner shall have all watermains swabbed, flushed, pressure tested, chlorinated and bacterial tested in accordance with Town and Fire Code requirements and approved by the Director of Operations. (c) The Owner shall, prior to the issuance of the Preliminary Certificate of Completion of Primary Services, supply the Director of Operations with the Town’s standard service cards in full digital format of each water service constructed to serve the buildings which are to be to be erected on the Lands. In addition to all text fields shown on the service card template, the following information must be provided on each service card: • Location of service from lot corner; • Location of service from nearest fixed object; • Location of curb stop/shut-off valve; • Location of main from property line; • Depth of service at property line; • Size and material type of service; • Indicated north direction; (d) The Owner agrees to place a plastic or burlap bag over all hydrants that are not actively in service. (e) The Owner agrees to mark each valve box with a 1.2 metre marker painted blue and shall ensure the same is kept clear of debris, fill, equipment or material. (f) The Owner agrees that no Person or Persons, except the Director of Operations or those acting under the Director of Operations authority, shall open or close any valve, or hydrant in any street main connected into and served by the Town's water system or interfere with the source in any manner. (g) The Owner agrees to address fire flows requirements and any deficiencies and to construct the necessary system improvements to provide adequate water pressure and fire flows to the proposed development to the satisfaction of the Director of Operations and Fire Department prior to any approvals. Upon completion of primary services and before any financial releases, the fire hydrants must be pressure and flow tested as per Fire Code requirements. (h) The Owner agrees that the watermain system be designed to the satisfaction of the Town’s Operations Department, and that the proposed watermain for Oakley Drive be oversized to a minimum size of 200mm, and that the owner pays their proportionate share of the costs.
Appears in 2 contracts
Samples: Subdivision Agreement, Subdivision Agreement
Watermains. (a) The Owner shall connect to the existing watermain system for the purpose of servicing the Lands in accordance with the design, plans and specifications approved by the Director of Operations.
(b) Upon completion of the Primary Services, prior to any financial release and prior to connecting to the Town's existing watermain system, the Owner shall have all watermains swabbed, flushed, pressure tested, chlorinated and bacterial tested in accordance with Town and Fire Code requirements and approved by the Director of Operations.
(c) The Owner shall, prior to the issuance of the Preliminary Certificate of Completion of Primary Services, supply the Director of Operations with the Town’s standard service cards in full digital format of each water service constructed to serve the buildings which are to be to be erected on the Lands. In addition to all text fields shown on the service card template, the following information must be provided on each service card: • Location of service from lot corner; • Location of service from nearest fixed object; • Location of curb stop/shut-off valve; • Location of main from property line; • Depth of service at property line; • Size and material type of service; • Indicated north direction;
(d) The Owner agrees to place a plastic or burlap bag over all hydrants that are not actively in service.
(e) The Owner agrees to mark each valve box with a 1.2 metre marker painted blue and shall ensure the same is kept clear of debris, fill, equipment or material.
(f) The Owner agrees that no Person or Persons, except the Director of Operations or those acting under the Director of Operations authority, shall open or close any valve, or hydrant in any street main connected into and served by the Town's water system or interfere with the source in any manner.
(g) The If applicable, the Owner agrees to address fire flows requirements and any deficiencies and to construct the necessary system improvements to provide adequate water pressure and fire flows to the proposed development to the satisfaction of the Director of Operations and Fire Department prior to any approvals. Upon completion of primary services and before any financial releases, the fire hydrants must be pressure and flow tested as per Fire Code requirements.
(h) The Owner agrees that the watermain system be designed to the satisfaction of the Town’s Operations Department, and that the proposed watermain for Oakley Drive be oversized to a minimum size of 200mm, and that the owner pays their proportionate share of the costs.
Appears in 2 contracts
Samples: Subdivision Agreement, Subdivision Agreement
Watermains. (a) The Owner shall connect to the existing watermain system for the purpose of servicing the Lands in accordance with the design, plans and specifications approved by the Director of Operations.
(b) . Upon completion of the Primary Services, prior to any financial release and prior to connecting to the Town's existing watermain system, the Owner shall have all watermains swabbed, flushed, pressure tested, chlorinated and bacterial tested in accordance with Town and Fire Code requirements and approved by the Director of Operations.
(c) . The Owner shall, prior to shall flow test all new fire hydrants and colour code in accordance with the issuance requirements of the Preliminary Certificate of Completion of Primary Services, NFPA 291 The Owner shall supply the Director of Operations Town with the Town’s standard service cards in full digital format showing the location of the water lines serving each water service constructed to serve the buildings which are to be dwelling to be erected on upon the LandsLots. In addition to all text fields shown on the service card template, the following information must be provided on each service card: • Location of service from lot corner; • Location of service from nearest fixed object; • Location of curb stop/shut-off valve; • Location of main from property line; • Depth of service at property line; • Size and material type of service; • Indicated north direction;
(d) The Owner agrees to place a plastic or burlap bag over all hydrants that are not actively in service.
(e) . The Owner agrees to mark each valve box with a 1.2 metre marker painted blue and shall ensure the same is kept clear of debris, fill, equipment or material.
(f) . The Owner agrees that no Person or Persons, except the Director of Operations or those acting under the Director of Operations authority, shall open or close any valve, or hydrant in any street main connected into and served by the Town's Towns water system or interfere with the source in any manner.
(g) . The design and installation of all Public Utilities shall be at the sole cost of the Owner agrees and shall be subject to address fire flows requirements the terms and conditions of the utility company or commission. The owner shall prepare a composite utility plan that allows for the safe installation of all utilities, including required separation between utilities. That prior to commencing any deficiencies and to construct work the necessary system improvements to provide adequate water pressure and fire flows to owner must confirm that sufficient wire-line communication/telecommunication infrastructure is currently available within the proposed development to provide communication/telecommunication service to the satisfaction of proposed development. In the Director of Operations and Fire Department prior to any approvals. Upon completion of primary services and before any financial releasesevent that such infrastructure is not available, the fire hydrants must be pressure and flow tested as per Fire Code requirements.
(h) The Owner agrees that the watermain system be designed to the satisfaction of the Town’s Operations Department, and that the proposed watermain for Oakley Drive be oversized to a minimum size of 200mm, and owner is hereby advised that the owner pays their proportionate share may be required to pay for the connection to and/or extension of the costsexisting communication/telecommunication infrastructure. If the owner elects not to pay for such connection to and/or extension of the existing communication/telecommunication infrastructure, the owner shall be required to demonstrate to the appropriate municipality that sufficient alternative communication/telecommunication facilities are available within the proposed development to enable, at a minimum, the effective delivery of communication or telecommunication services for emergency management services. That the owner enters into a separate agreement with Niagara-on-the-Lake Hydro for the provision of hydro services for the development. The owner agrees to contact Enbridge Gas Distribution’s Customer Connections department for service and meter installation details and to ensure all gas piping is installed prior to the commencement of site landscaping (including, but not limited to: tree planting, xxxxx cells, and /or soil trenches) and/or asphalt paving. If the gas main needs to be relocated as a result of changes in the alignment or grade of the future road allowances or for temporary gas pipe installations pertaining to phase construction, all costs are the responsibility of the applicant. The owner agrees to provide any required easement(s) to Enbridge Gas Distribution at no cost. In the event a pressure reducing regulator station is required by Enbridge Gas Distribution, the owner agrees to provide a 3 metre by 3 metre exclusive use location that cannot project into the municipal road allowance. The final size and location of the regulator station will be confirmed by Enbridge Gas Distribution’s Customer Connections department. The owner agrees to grade all road allowances to as final elevation as possible, provide necessary field survey information and all approved municipal road cross sections to Enbridge Gas Distribution, identifying all utility locations prior to the installation of the gas piping.
Appears in 1 contract
Samples: Subdivision Agreement