Westbound Ramps Clause Samples
Westbound Ramps. I-2/US 83
a) Pavement rehabilitation of existing exit ramp RWX2ND to remain in place. (Modifications to cross sectional elements may be required.)
b) Removal of existing entrance ramp between ▇. ▇▇▇▇▇▇ Rd. and ▇. ▇▇▇▇▇▇▇ Ave.
c) Removal of existing entrance and exit ramps between ▇. ▇▇▇▇▇▇▇ Ave. and ▇. ▇▇▇▇▇▇▇ Rd. and the design and construction of Braided Ramps RWXJAC (two lane) and RWEJAX (New Pavement).
d) Removal of existing entrance and exit ramps between Business 83/Center Ave. and Sugar Rd. and design and construction of entrance ramp RWESUG (New Pavement).
e) Removal of existing entrance and exit ramp between Cage Blvd. (US 281) and Sugar Rd.
f) Design and reconstruction of exit ramp RWXSUG west of Cage Blvd. (US 281) (New Pavement).
g) Design and reconstruction of entrance ramp RWEVET located East of Cage Blvd (New Pavement).
h) Removal of exit and entrance ramp between Cage Blvd. (US 281) and Veterans Blvd. and design and construction of exit ramp RWX281 (New Pavement).
i) Removal of existing entrance and exit ramps between Veterans Blvd. and FM 1426 and design and construction of braided ramps RWXVET and RWENEB (New Pavement).
j) Removal of existing entrance ramp east of FM 1426 and design and construction of entrance ramp RWECES (New Pavement).
Westbound Ramps. I-410/Loop 1604
