We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.
For more information visit our privacy policy.Fittings 2.2.1 Support structure and attachment fittings for the flap structure 2.2.2 Support structure and attachment fitting for the engine pylons 2.2.3 Support structure and attachment fitting for the main landing gear 2.2.4 Support structure and attachment fitting for the center wing box
Surface Preparation Clean the surface to be treated of all dust, dirt, clay, grass, sod and any other deleterious matter before application of the asphalt surface treatment.
Decorations The only acceptable form of affixing items to walls is the use of white sticky tack, and must be removed by the Resident prior to move out, or be subject to removal charges. Spikes, hooks, screws, tacks or nails or any permanent adhesion type tape shall not be put into or on the walls or woodwork, ceilings, furnishings, doors or windows of any part of the Residence. Residents may not decorate the outside of their room door unless for special occasions approved by the Manager. Strings of indoor lights should not be in direct contact with any flammable materials and should not be left on while the room is unattended.
Site Preparation Axon will provide a hardcopy or digital copy of current user documentation for the Axon Devices ("User Documentation"). User Documentation will include all required environmental specifications for the professional services and Axon Devices to operate per the Axon Device User Documentation. Before installation of Axon Devices (whether performed by Customer or Axon), Customer must prepare the location(s) where Axon Devices are to be installed ("Installation Site") per the environmental specifications in the Axon Device User Documentation. Following installation, Customer must maintain the Installation Site per the environmental specifications. If Axon modifies Axon Device User Documentation for any Axon Devices under this Agreement, Axon will provide the update to Customer when Axon generally releases it
Layout a. Estimate and quantity sheet (1) List of all bid items (2) Bid item quantities (3) Specification item number (4) Paid item description and unit of measure b. Basis of estimate sheet (list of materials) c. General notes and specification data. d. Condition diagram (1) Highway and intersection design features (2) Roadside development (3) Traffic control including illumination e. Plan sheet(s) (1) Existing traffic control that will remain (signs and markings) (2) Existing utilities (3) Proposed highway improvements (4) Proposed installation (5) Proposed additional traffic controls (6) Proposed illumination attached to signal poles. (7) Proposed power pole source f. Notes for plan layout g. Phase sequence diagram(s) (1) Signal locations (2) Signal indications (3) Phase diagram (4) Signal sequence table (5) Flashing operation (normal and emergency) (6) Preemption operation (when applicable) (7) Contact responsible Agency to obtain interval timing, cycle length and offset h. Construction detail sheets(s) (1) Poles (State standard sheets) (2) Detectors (3) Pull Box and conduit layout (4) Controller Foundation standard sheet (5) Electrical chart i. Marking details (when applicable)
Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.
Reopeners 1. Negotiations may be reopened by mutual agreement on any part of this contract. 2. Written notice shall be given by the Association to commence reopener negotiations during each fiscal year of this Agreement no earlier than March 1st of the prior year. However, the District may commence reopener negotiations after September 1st of each fiscal year of this Agreement if the Association has not commenced reopener negotiations on or before August 31st. Each party shall be afforded the following number of articles to reopen: A. 2016-2017: No reopeners, full successor negotiations completed B. 2017-2018: Two reopeners, plus Articles 22 and 24 C. 2018-2019: Three reopeners, plus Articles 22 and 24