Examples of Access Lot in a sentence
This standard is not adjustable for dwellings within the city-recognized boundaries of Amazon Neighbors, Fairmount Neighbors and South University Neighborhood Association.(b) Area – Specific Alley Access Lot Standards in R-1.
This standard is not adjustable for dwellings within the city-recognized boundaries of Amazon Neighbors, Fairmount Neighbors and South University Neighborhood Association.(b) Area-Specific Alley Access Lot Standards in R-1.
For alley access lots, EC 9.2751(18)(a)5 is the only standard that may be adjusted.(b) Area-Specific Alley Access Lot Standards in R-1.
If the title is transferred to a home owners association of the interior lot owners, the preliminary plan and final plat must designate the lots covered by the home owners association for each Water Access Lot.
In addition to any easements shown on the recorded subdivision plat, there shall be a twenty (20) foot easement in favor of the Association across each Water Access Lot commencing at the lake lot line and running parallel thereto for the entire width of the lot, for the purposes of installing, replacing, repairing and maintaining all shorelines, structures, slopes and other items necessary for the operation and maintenance of the Lake.
Notwithstanding the foregoing, the Access Lot shall be allocated no voting rights and no fraction or percentage of Common Expenses.
Access Lot 205 which serves 6 lots is proposed to have a legal width of 4.0m and carriageway width of 2.7m (with passing bay) and therefore does not comply with a legal width of 6.0m and a carriageway width 5.0m required by Table 4 of Part H of the District Plan.
Table 1: Residential Lot Frontage and Size Requirements Classification of Street Access Frontage on Street of Access Lot Width at Building LineUseable Lot Area with Public Water & Sewer (sq.Useable Lot Area without Public Water or Sewer (sq.
The City Plan allows for the Spine Road to be in the same location as the Residents Access Lot (min.
Any Water Access Lot Owner may call a meeting by mailing written notice to each Water Access Lot Owner’s Dwelling at least thirty (30) days prior to the meeting which notice specifies that a vote may be taken regarding maintenance and repair of the Water Access Parking Area.