Accretion Test definition

Accretion Test has the meaning assigned to such term in Section 5.7(g).

Examples of Accretion Test in a sentence

  • Figure 8: A 3-D model of the Fundamental ice Accretion Test Cell showing the inlet bell mouth and the exhaust duct through which a downstream compressor pulls air through the test cell.

Related to Accretion Test

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).

  • PRINCIPAL TEST The CONTRACTOR rather than COUNTY has the right to control the manner and means of accomplishing the result contracted for.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Class C Coverage Tests means the Class C Interest Coverage Test and the Class C Par Value Test.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Confirmation test means a drug or alcohol test on a sample to substantiate the results of a prior drug or alcohol test on the same sample and which uses different chemical principles and is of equal or greater accuracy than the prior drug or alcohol test;

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • Class D Coverage Tests means the Class D Interest Coverage Test and the Class D Par Value Test.

  • Interest Coverage Test means the Class A/B Interest Coverage Test, the Class C Interest Coverage Test, the Class D Interest Coverage Test and the Class E Interest Coverage Test.

  • Subproject means a specific project to be carried out by an existing BE utilizing the proceeds of a Sub-loan or Investment, as hereinafter defined, fulfilling the conditions set forth in Part A of Schedule 4 to this Agreement;

  • Asset Test means, for an Asset Review, each Test, as defined in the Asset Representations Review Agreement, in Schedule A to the Asset Representations Review Agreement to be performed by the Asset Representations Reviewer on the related Asset Review Receivables.

  • Class A/B Interest Coverage Test means the test which will apply as of any Measurement Date occurring on and after the Determination Date immediately preceding the second Payment Date and which will be satisfied on such Measurement Date if the Class A/B Interest Coverage Ratio is at least equal to 120.0 per cent.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Class C Interest Coverage Test means the test which will apply as of any Measurement Date occurring on and after the Determination Date immediately preceding the second Payment Date and which will be satisfied on such Measurement Date if the Class C Interest Coverage Ratio is at least equal to 110.0 per cent.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Minimum Weighted Average Coupon Test means a test that will be satisfied on any Measurement Date if the Weighted Average Coupon equals or exceeds 7.0%.

  • Structural component means a component that supports non-variable forces or weights (dead loads) and variable forces or weights (live loads).

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Class D Interest Coverage Test means the test which will apply as of any Measurement Date occurring on and after the Determination Date immediately preceding the second Payment Date and which will be satisfied on such Measurement Date if the Class D Interest Coverage Ratio is at least equal to 105.0 per cent.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Coverage Test means each of the Class A/B Par Value Test, the Class A/B Interest Coverage Test, the Class C Par Value Test, the Class C Interest Coverage Test, the Class D Par Value Test, the Class D Interest Coverage Test, the Class E Par Value Test and the Class E Interest Coverage Test.