Active Interconnection Study definition

Active Interconnection Study has the meaning set forth in Section 4.6(a) of the BioMAT Tariff. “Affiliate” means, with respect to a Party, any entity that, directly or indirectly, through one or more

Examples of Active Interconnection Study in a sentence

  • Category 3 Projects that do not have an Active Interconnection Study at the time the BioMAT PPA is executed shall submit a new Interconnection Study application within 30 days of executing the BioMAT PPA.

  • Provided all other requirements are met, Category 3 Projects without an Active Interconnection Study are eligible to participate in the BioMAT queue, provided the Applicant has provided a cash deposit as described in Section E.2(b) of this Schedule.

  • Category 3 Projects that do not T have an Active Interconnection Study at the time the BioMAT PPA is executed shall submit a N new Interconnection Study application within 30 days of executing the BioMAT PPA.

  • An Applicant’s Interconnection Study must have an active interconnection queue number in N SDG&E’s public interconnection queue (Active Interconnection Study) in order for the Applicant to be eligible to participate and remain in the BioMAT queue, with the exception of Applicants with Category 3 Projects.

  • An Applicant’s Interconnection Study must have an active interconnection queue number in SDG&E’s public interconnection queue (Active Interconnection Study) in order for the Applicant to be eligible to participate and remain in the BioMAT queue, with the exception of Applicants with Category 3 Projects.

  • Category 3 Deposit: Applicants submitting PPRs for Category 3 Projects without an Active Interconnection Study from SDG&E’s public interconnection queue, or those who subsequently withdraw their Active Interconnection Sudy after submitting a PPR, must pay a deposit equal to three times the System Impact Study’s Detailed Deposit amount as described in SDG&E’s Electric Rule No. 21 Tariff.

  • An Applicant’s Interconnection Study must have an active interconnection queue number in PG&E’s public wholesale distribution queue or the public CAISO interconnection queue (Active Interconnection Study) in order for the Applicant to be eligible to participate and remain in the BioMAT queue, with the exception of Applicants with Category 3 Projects.

  • Applicants submitting PPRs for Category 3 Projects without an Active N Interconnection Study from SDG&E’s public interconnection queue, or those who subsequently withdraw their Active Interconnection Study after submitting a PPR, must pay a deposit equal tothree times the System Impact Study’s Detailed Deposit amount as described in SDG&E’s Electric Rule No. 21 Tariff.

  • Expected COD: No later than thirty-six (36) months from execution date of the BioMAT PPA, or within thirty-six (36) months of the Interconnection Study Completion Date for Category 3 Projects that do not have an Active Interconnection Study at the time the BioMAT PPA is executed, as described in Section 4.6.b.

  • Provided all other requirements are met, Category 3 Projects that no longer have an Active Interconnection Study shall remain eligible to participate in the BioMAT queue, provided the Applicant has provided a cash deposit as described in Section 5.2(b) of this Schedule.

Related to Active Interconnection Study

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Interconnector means equipment used to link the electricity system of the State to electricity systems outside of the State;