Aggregated Telemetering Cost Cap definition

Aggregated Telemetering Cost Cap has the meaning set forth in Appendix E. [Only applicable if Facility is less than 0.5 MW]
Aggregated Telemetering Cost Cap has the meaning set forth in Appendix F. [Only applicable if Facility is less than 500 kW] “Aggregated Telemetering System” has the meaning set forth in Appendix F. [Only applicable if Facility is less than 500 kW] “Aggregated Telemetering System Installation Costs” means initial costs to Seller for the purchase and installation of the Aggregated Telemetering System. In no event shall “Aggregated Telemetering System Installation Costs” include ongoing operating expenses of the Aggregated Telemetering System following its initial installation, including but not limited to communication costs and costs associated with maintaining a T-1 line. [Only applicable if Facility is less than 500 kW] “Arbitration has the meaning set forth in Section 19.3.

Examples of Aggregated Telemetering Cost Cap in a sentence

  • In no event shall the Aggregated Telemetering System Installation Costs exceed Twenty Thousand dollars ($20,000.00) (the “Aggregated Telemetering Cost Cap”); provided that if the Aggregated Telemetering System Installation Costs exceed the Aggregated Telemetering Cost Cap then Buyer shall have the right, but not the obligation, in its sole discretion, to agree to pay for such costs in excess of the Aggregated Telemetering Cost Cap.

Related to Aggregated Telemetering Cost Cap

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Maximum Applied Water Allowance (MAWA) means the upper limit of annual applied water for the established landscaped area as specified in Section 492.4. It is based upon the area's reference evapotranspiration, the ET Adjustment Factor, and the size of the landscape area. The Estimated Total Water Use shall not exceed the Maximum Applied Water Allowance. Special Landscape Areas, including recreation areas, areas permanently and solely dedicated to edible plants such as orchards and vegetable gardens, and areas irrigated with recycled water are subject to the MAWA with an ETAF not to exceed 1.0. MAWA = (ETo) (0.62) [(ETAF x LA) + ((1-ETAF) x SLA)]

  • Fully Burdened Manufacturing Cost means, with respect to any Licensed Product supplied by or on behalf of NVCR to Zai hereunder if such Licensed Product (or any precursor or intermediate thereof) is manufactured by a Third Party manufacturer [***].

  • Manufacturing Cost means [***].

  • Maximum allowable cost list means a list of drugs for

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Operating Costs means the incremental expenses incurred by the Recipient on account of Project implementation, management, and monitoring, including for office space rental, utilities, and supplies, bank charges, communications, vehicle operation, maintenance, and insurance, building and equipment maintenance, advertising expenses, travel and supervision, salaries of contractual and temporary staff, but excluding salaries, fees, honoraria, and bonuses of members of the Recipient’s civil service.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Maximum allowable cost means the maximum amount that a pharmacy benefit manager will reimburse a pharmacy for the cost of a drug.

  • Controllable Operating Expenses means all Operating Expenses except real property taxes, all forms of insurance, utility expenses, costs of services provided under a union contract, payments under CC&R’s or to an owners’ association and costs associated with repairs due to casualty, vandalism or other source outside of Landlord’s reasonable control.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Operating Expenses is defined to include all expenses necessary or appropriate for the operation of the Fund (or Class, as applicable), including the Advisor’s investment advisory or management fee detailed in the Investment Advisory Agreement and any Rule 12b-1 fees and other expenses described in the Investment Advisory Agreement, but does not include taxes, leverage interest, brokerage commissions, dividend and interest expenses on short sales, acquired fund fees and expenses (as determined in accordance with SEC Form N-1A), expenses incurred in connection with any merger or reorganization, or extraordinary expenses such as litigation expenses.

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Working voltage means the highest value of an electrical circuit voltage root-mean-square (rms), specified by the manufacturer, which may occur between any conductive parts in open circuit conditions or under normal operating conditions. If the electrical circuit is divided by galvanic isolation, the working voltage is defined for each divided circuit, respectively.

  • Additional Transportation Cost means the actual cost incurred for one-way Economy Transportation by Common Carrier reduced by the value of an unused travel ticket.

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • Baseline area means any intra- state area (and every part thereof) des- ignated as attainment or unclassifiable under section 107(d)(1)(A)(ii) or (iii) of the Act in which the major source or major modification establishing the minor source baseline date would con- struct or would have an air quality im- pact for the pollutant for which the baseline date is established, as follows: equal to or greater than 1 μg/m3 (an- nual average) for SO2, NO2, or PM10; or equal or greater than 0.3 μg/m3 (annual average) for PM2.5.(ii) Area redesignations under section 107(d)(1)(A)(ii) or (iii) of the Act cannot intersect or be smaller than the area of impact of any major stationary source or major modification which:

  • Building Operating Expenses means the portion of "Operating Expenses," as that term is defined in Section 4.2.7 below, allocated to the tenants of the Building pursuant to the terms of Section 4.3.1 below.

  • Base Capacity Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Resources and the clearing price for Capacity Performance Resources, representing the cost to procure additional Capacity Performance Resources out of merit order when the Base Capacity Resource Constraint is binding.

  • Maximum Concentration Level Assessment means the Maximum Concentration Level Assessment for the purposes of a Basic Comprehensive Certificate of Approval, described in the Basic Comprehensive User Guide, prepared by a Toxicologist using currently available toxicological information, that demonstrates that the concentration at any Point of Impingement for a Compound of Concern that does not have a Ministry Point of Impingement Limit is not likely to cause an adverse effect as defined by the EPA. The concentration at Point of Impingement for a Compound of Concern must be calculated in accordance with O. Reg. 419/05.

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).