Examples of Appropriate Load Despatch Centre in a sentence
Readings recorded by Main, Check and Standby meters for every time slot shall be analysed, crosschecked and validated by the Appropriate Load Despatch Centre (LDC).
THESE TWO WILL REPLACE ORIGINAL JUDGES WHO CANNOT SERVE IN THAT CAPICITY.
Access at Connection Site The requester or user, as the case may be so owning the electrical plant shall provide reasonable access and other required facilities to the licensee or Appropriate Transmission Utility or Appropriate Load Despatch Centre, whose equipment is installed or proposed to be installed at the Connection Site for installation, operation and maintenance, etc.
Those Conditions hereof which expressly or impliedly have effect after termination will continue to be enforceable notwithstanding termination.
Coordination in Operations (1) No Entity shall introduce or take out the element of the grid without the concurrence of the Appropriate Load Despatch Centre except in case of imminent risk of safety of plant and personnel in which case it must intimate Appropriate Load Despatch Centre giving reasons therefore.(2) The Appropriate Load Despatch Centre shall inform all affected parties of the outage.
The generating company or transmission licensee shall, before actual shut down, obtain the approval of the Appropriate Load Despatch Centre.
Access at Connection Site The requester or user, as the case may be, owning the electrical plant shall provide reasonable access and other required facilities to the licensee or Appropriate Transmission Utility or Appropriate Load Despatch Centre, whose equipment is installed or proposed to be installed at the Connection Site for installation, operation and maintenance, etc.
The requester and user shall prepare single line schematic diagrams in respect of its system facility and make the same available to the Appropriate Transmission Utility or licensee through which his system is connected and the Appropriate Load Despatch Centre.
Coordination in Operations.- (1) No Entity shall introduce or take out the element of the grid without the concurrence of the Appropriate Load Despatch Centre except in case of imminent risk of safety of plant and personnel in which case it must intimate Appropriate Load Despatch Centre giving reasons therefore.
Omitted and inserted clause (a) and (b) of sub-Regulation (1) of Regulation 15, vide Third amendment (C), 2019.(ii) Readings recorded by Main, Check and Standby meters for every time slot shall be analysed, crosschecked and validated by the Appropriate Load Despatch Centre (LDC).