Large project means, for purposes of the Soft Cost Ratio limitation in Section 3.F, a Project with more than 24 Housing Credit units.
Disaster recovery project means a project located on property
Mixed-use project means a project comprising both a qualified
NCZ Examined Project means any Generator or UDR project that is not exempt pursuant to 23.4.5.7.8 and either (i) is in a Class Year on the date the Commission accepts the first ICAP Demand Curve to apply to a Mitigated Capacity Zone or (ii) meets the criteria specified in 23.4.5.7.3(II). An NCZ Examined Project may be at any phase of development or in operation or an Installed Capacity Supplier.For purposes of Section 23.4.5 of this Attachment H, “Net CONE” shall mean the localized levelized embedded costs of a peaking unit in a Mitigated Capacity Zone, net of the likely projected annual Energy and Ancillary Services revenues of such unit, as determined in connection with establishing the Demand Curve for a Mitigated Capacity Zone pursuant to Section 5.14.1.2 of the Services Tariff, or as escalated as specified in Section 23.4.5.7 of Attachment H.
Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.
Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.
Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.
Landing Gear means the installed main and nose landing gear, components and their associated actuators, side braces and parts.
Qualified project means the construction or expansion of any capital project of the Borrower or any of its Restricted Subsidiaries, the aggregate actual or budgeted capital cost of which (in each case, including capital costs expended by the Borrower or any such Restricted Subsidiaries prior to the construction or expansion of such project) exceeds $50,000,000.
Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)
Improvement Fund means the Improvement Fund for General Obligation Temporary Notes, Series 2017-1 created pursuant to Section 501 hereof.
Nuclear reactor means any apparatus designed or used to sustain nuclear fission in a self-supporting chain reaction or to contain a critical mass of fissionable material.
Cannabis testing facility means an entity registered by
Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.
The Works/Project means the works to be executed or done under this contract.
RUNNING CHARGE PER KILOMETER means the rates payable against each KM run. and shall be deemed to include all the expenditures of the Transport Supplier viz., cost of fuel, tyre/tube, battery & consumables like lubricants etc. and other maintenance expenditures including accessories involved including GST element as applicable towards movement of the vehicle(s)/equipment.
Resource Substitution Charge means a charge assessed on Capacity Market Buyers in an Incremental Auction to recover the cost of replacement Capacity Resources.
Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:
Infrastructure project means any activity related to the construction, alteration, maintenance, or repair of infrastructure in the United States regardless of whether infrastructure is the primary purpose of the project. See also paragraphs (c) and (d) of 2 C.F.R. 184.4.
Combustion turbine means an enclosed fossil or other fuel-fired device that is comprised of a compressor, a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.
Single-family dwelling unit means a structure that is usually occupied by just one household or family and for the purposes of this Policy is expected to generate an average of 250 gallons per day of wastewater.
Mixed-use property means an eligible property that includes three or more residential units and may also contain a commercial property component in the same building.
Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:
Qualified Project Costs means costs paid with respect to the Project that meet each of the following requirements: (i) the costs are properly chargeable to capital account (or would be a so chargeable with a proper election by the Borrower or but for a proper election by the Borrower to deduct such costs) in accordance with general federal income tax principles and in accordance with Section 1.103-8(a)(1) of the Regulations, provided, however, that only such portion of the interest accrued during rehabilitation or construction of the Project (in the case of rehabilitation, with respect to vacated units only) shall be eligible to be a Qualified Project Cost as bears the same ratio to all such interest as the Qualified Project Costs bear to all costs of the acquisition and construction or rehabilitation of the Project; and provided further that interest accruing after the Completion Date (as defined in the Regulatory Agreement) shall not be a Qualified Project Cost; and provided still further that if any portion of the Project is being constructed or rehabilitated by an Affiliate (whether as general contractor or a subcontractor), Qualified Project Costs shall include only (A) the actual out of pocket costs incurred by such affiliate in constructing or rehabilitating the Project (or any portion thereof) and (B) any overhead expenses incurred by such affiliate which are directly attributable to the work performed on the Project, and shall not include, for example, intercompany profits resulting from members of an “affiliated group” (within the meaning of Section 1504 of the Code) participating in the rehabilitation or construction of the Project or payments received by such affiliate due to early completion of the Project (or any portion thereof); (ii) the costs are paid with respect to a qualified residential rental project or projects within the meaning of Section 142(d) of the Code, (iii) the costs are paid after the earlier of 60 days prior to May 20, 2021, being the date on which the Governmental Lender first declared its “official intent” to reimburse costs paid with respect to the Project (within the meaning of Section 1.150-2 of the Regulations) or the date of issue of the Funding Loan, and (iv) if the costs of the acquisition and construction or rehabilitation of the Project were previously paid and are to be reimbursed with proceeds of the Funding Loan such costs were (A) “preliminary expenditures” (within the meaning of Section 1.150-2(f)(2) of the Regulations) with respect to the Project (such as architectural, engineering and soil testing services) incurred before commencement of acquisition and construction or rehabilitation of the Project that do not exceed 20% of the issue price of the Funding Loan (as defined in Section 1.148-1 of the Regulations), or (B) were capital expenditures with respect to the Project that are reimbursed no later than 18 months after the later of the date the expenditure was paid or the date the Project is placed in service (but no later than three years after the expenditures is paid); provided, however, that (w) Costs of Funding shall not be deemed to be Qualified Project Costs;(x) fees, charges or profits (including, without limitation, any Developer Fee) payable to the Borrower or a “related person” (within the meaning of Section 144(a)(3) of the Code) shall not be deemed to be Qualified Project Costs; (y) letter of credit fees and municipal bond insurance premiums which represent a transfer of credit risk shall be allocated between Qualified Project Costs and other costs and expenses to be paid from the proceeds of the Funding Loan; and (z) letter of credit fees and municipal bond insurance premiums which do not represent a transfer of credit risk (including, without limitation, letter of credit fees payable to a “related person” to the Borrower) shall not constitute Qualified Project Costs.
Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.
Infrastructure facility means a building; structure; or networks of buildings, structures, pipes, controls, and equipment, or portion thereof, that provide transportation, utilities, public education, or public safety services. Included are government office buildings; public schools; courthouses; jails; prisons; water treatment plants, distribution systems, and pumping stations; wastewater treatment plants, collection systems, and pumping stations; solid waste disposal plants, incinerators, landfills, and related facilities; public roads and streets; highways; public parking facilities; public transportation systems, terminals, and rolling stock; rail, air, and water port structures, terminals, and equipment.