Examples of AS 2885 in a sentence
Licensee must operate and maintain the Pipeline in accordance with, and otherwise comply with, AS 2885 and any other standards required by the Director of Gas Safety.
As the flowline will be constructed to Australian Standard (AS) 2885 and will be fit-for-purpose under the Petroleum and Gas (Safety) Regulation 2018, risk of premature cracking leading to fugitive emissions of fractured flowline is considered low.
The realigned pipeline will be designed, constructed and operated in accordance with AS 2885 standards.
The Licensee must comply with all relevant recognised standards and practices applicable to the operation of a gas transmission pipeline, including AS 2885 Pipelines – Gas and Liquid Petroleum.
The Pipeline Licence dictates AS 2885 as the guiding standard, AS 2885.3 addresses the operation and maintenance of pipelines and repeatedly states the need to ensure employees are trained to do their job and the need to ensure competence of those employees.
Pipeline assets are regularly monitored for damage in accordance with AS 2885, should any damage occur due to climate, this would be identified as part of normal operations and repaired.349Query regarding how the risk ratings were arrived at, and that a low risk rating isThe climate change risk assessment was undertaken in line with AS 5334-2013 Climate change adaptation for settlements and infrastructure – A risk-based approach.
The request can be considered in a comprehensive review of the TRLEP 2010.In response to APA Group requirements a Safety Management Strategy (SMS) was developed to satisfy Australian Standard AS 2885.
AGN’s risk management framework is based on AS/NZS ISO 31000 Risk Management – Principles and Guidelines, and the requirements of AS 2885 Pipelines-Gas and Liquid Petroleum and AS/NZS 4645 Gas Distribution Network Management.
Welding procedures are subject to the development and qualification of a welding procedure in accordance with the requirements of AS 2885 Part 2.Pipe joint coating is a three layer epoxy heat shrink sleeve attaches using a qualified procedure and subject to ongoing testing during application.
The work is necessary to ensure the reliability of service and is a process to meet the requirements of AS 2885.