Asbestos Abatement Design definition

Asbestos Abatement Design means a written or graphic plan prepared by an accredited abatement designer specifying how an asbestos abatement project will be performed, and includes, but is not limited to, scope of work and technical specifications. The asbestos abatement designer's signature and accreditation number shall be on all such abatement designs.
Asbestos Abatement Design means a written or graphic plan that is prepared by an accredited
Asbestos Abatement Design means a written or graphic plan that is prepared by an accredited abatement designer as defined in Subparagraph (a)(1) of this Rule and that specifies how an asbestos abatement project will be performed. An asbestos abatement design shall include, at minimum, the following:

Examples of Asbestos Abatement Design in a sentence

  • An Asbestos Abatement Design Consultant licensed by the MDEP will prepare the design.

  • Wisconsin Room Upgrades.Schematic design level drawings are available showing the project scope of work.The total project budget is $40,723,000; and the construction budget is approximately $28,000,000.The Asbestos Abatement Design Services provider will be contracted separately from the design team and will report directly to DFD Project Manager and the DFD Construction Representative.

  • Prepare asbestos abatement work areas in accordance with the Abatement Contractor's asbestos abatement design (prepared by a MDEP licensed Asbestos Abatement Design Consultant) and with current MDEP Asbestos Management Regulations, Chapter 425.

  • If an Asbestos Abatement Design is required, a licensed Project Designer must be used to create the design.

  • A comprehensive Asbestos Abatement Design is required for all asbestos projects involving the removal of more than 3,000 square feet, 1,500 linear feet, or 656 cubic feet of friable ACM.

  • Task 3b – Asbestos Abatement Design For this task, B&L will provide project technical specifications for the removal of ACM from the entire building structure (as a separate IRM) prior to the commencement of the planned subsurface investigation and IRM activities.

  • Prepare asbestos abatement work areas in accordance with the Contractor's asbestos abatement design (prepared by a MEDEP licensed Asbestos Abatement Design Consultant) and with current State of Maine Asbestos Management Regulations, Chapter 425.

  • The Asbestos Abatement Design Consultant responsible for the design of record (latest version) must ensure that the design is consistent with the requirements of this rule.

  • Woodard Center RenovationCharlotte, North Carolina S&ME Project No. 4335-16-057 Dear Mr. Sweat: Attached is the Asbestos Abatement Design for removal of asbestos containing cement siding from the renovation area of V.

  • For each abatement area the Contractor will provide decontamination facilities located in an area established in the Asbestos Abatement Design.


More Definitions of Asbestos Abatement Design

Asbestos Abatement Design means a written or graphic plan that is prepared by an accredited abatement designer as defined in Subparagraph (a)(1) of this Rule and that specifies specifying how an asbestos abatement project will be performed. performed, and includes, but is not limited to, scope of work and technical specifications. The An asbestos abatement design designer's signature and accreditation number shall be on all such abatement designs. include, at minimum, the following:

Related to Asbestos Abatement Design

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Underground storage tank or “UST” means any one or combination of tanks (including underground pipes connected thereto) that is used to contain an accumulation of regulated substances, and the volume of which (including the volume of underground pipes connected thereto) is 10 percent or more beneath the surface of the ground. This term does not include any:

  • piece-work means any work the pay for which is estimated by the amount of work performed irrespective of the time occupied in its performance;

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • Underground source of drinking water means an aquifer or its portion:

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • Underground injection means the subsurface emplacement of fluids through a bored, drilled or driven well; or through a dug well, where the depth of the dug well is greater than the largest surface dimension. (See also “injection well”.)

  • EPA Hazardous Substance Superfund means the Hazardous Substance Superfund established by the Internal Revenue Code, 26 U.S.C. § 9507.

  • Contaminated site means a site where there is a confirmed presence, caused by man, of hazardous substances of such a level that they pose a significant risk to human health or the environment taking into account current and approved future use of the land;

  • Remedial Design or “RD” shall mean those activities to be undertaken by SDs to develop final plans and specifications for the RA as stated in the SOW.

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Underground storage means storage of hazardous liquid in a subsurface stratum or formation of the earth.

  • Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.

  • Hazardous Materials Contamination means contamination (whether now existing or hereafter occurring) of the improvements, buildings, facilities, personalty, soil, groundwater, air or other elements on or of the relevant property by Hazardous Materials, or any derivatives thereof, or on or of any other property as a result of Hazardous Materials, or any derivatives thereof, generated on, emanating from or disposed of in connection with the relevant property.

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • Landlord Work means the work, if any, that Landlord is obligated to perform in the Premises pursuant to a separate agreement (the “Work Letter”), if any, attached to this Lease as Exhibit C.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Underground area means an underground room, such as a basement, cellar, shaft or vault, providing enough space for physical inspection of the exterior of the tank situated on or above the surface of the floor.

  • Private Improvements means the improvements to be constructed on the Property that are not Public Improvements.

  • Explosives or munitions emergency response specialist means an individual trained in chemical or conventional munitions or explosives handling, transportation, render-safe procedures, or destruction techniques. Explosives or munitions emergency response specialists include Department of Defense (DOD) emergency explosive ordnance disposal (EOD), technical escort unit (TEU), and DOD-certified civilian or contractor personnel; and other Federal, State, or local government, or civilian personnel similarly trained in explosives or munitions emergency responses.

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.

  • Underground storage tank system means an underground storage tank and the connected underground piping, underground ancillary equipment, and containment system, if any.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.