Examples of Burrard Thermal in a sentence
Most has been and continues to be addressed.British Columbia Hydro and Power Authority Burrard Thermal Generating StationCondition Assessment and Alternative Configuration Study Boiler asbestos seems to be being addressed in an expedient manner through the existing station program, but will required continued major investment in both control and removal activities.
This would 22 April 2008 RP157366-000-000 Revision 1 Page 21British Columbia Hydro and Power Authority Burrard Thermal Generating StationCondition Assessment and Alternative Configuration Study be called an “N+2, with N=4” sparing scenario.
It could be precipitated by a simple time related failure or by an external event such as a gas line pressure surge due to a multi-unit simultaneous trip.British Columbia Hydro and Power Authority Burrard Thermal Generating StationCondition Assessment and Alternative Configuration Study The on-site natural gas system has been in-service 40 years with some early cathodic corrosion issues that were not addressed until recently.
In the short term, someBritish Columbia Hydro and Power Authority Burrard Thermal Generating StationCondition Assessment and Alternative Configuration Study economic mix of firm and interruptible gas commodity contract may be the only answer with an integrated gas/electricity dispatch modeling capability employed.
Freshwater for boiler make-up, fire protection, domestic (potable) use and otherBritish Columbia Hydro and Power Authority Burrard Thermal Generating StationCondition Assessment and Alternative Configuration Study plant cooling service is supplied from a pumphouse on Lake Buntzen, approximately 6 km north of the station.
If gas is sold and contracted for under a stipulated curtailment priority relative to Burrard Thermal gas, and during the term of the auction sale, the Burrard Agreement is tested and found to vary that priority, the auction gas would take on different characteristics and probably should also take on a different price.
This facility will be nation’s first commercial gearbox testing facility capable of handling wind turbine equipment and will provide service to existing wind farms within a 300-mile radius of Enid.
Fan failures causing extensiveBritish Columbia Hydro and Power Authority Burrard Thermal Generating StationCondition Assessment and Alternative Configuration Study damage have occurred in the past where the impeller pieces have breached the scroll casing.
We may present advertisements from our partners, the purpose of which is to make you valuable offers for services, products, etc.
LP rotor: Only small problems with the LP rotors occurred in the past:British Columbia Hydro and Power Authority Burrard Thermal Generating StationCondition Assessment and Alternative Configuration Study - Some blades had cracks at base of erosion shields; erosion on others extended beyond the shield material; blades cropped and shields removed on affected blades Unit 1 (1994) and Unit 3.- cracks in stage 2 € both front and rear rows re-bladed.