Cabinet Office Efficiency and Reform Group definition

Cabinet Office Efficiency and Reform Group means the Efficiency and Reform Group (ERG) works in partnership with HM Treasury and government departments to deliver efficiencies, savings and reforms on behalf of UK taxpayers.

Examples of Cabinet Office Efficiency and Reform Group in a sentence

  • The single individual with overall accountability for ensuring that a programme meets its objectives and delivers the projected benefits7 (Cabinet Office Efficiency and Reform Group (ERG) 4 programme management methodology derived).

  • Xxxxx x/x David Evans Snell & Xxxxxx 000 East Xxxxxxxx, Xuxxx 000 Xxxx Xaxx Xxxx, Xxxx 00000-0000 Xxxxxxxxx Xx.: (000) 000-0000 XX XO THE ESCROW AGEXX: Xxx Xxxxxes of M.

  • Note that any proposed expenditure above £100,000 should receive approval through the Cabinet Office, Efficiency and Reform Group (ERG) marketing and advertising spending controls before any budget is committed.

  • The Department will assess each response according to the Cabinet Office Efficiency and Reform Group (the “ERG”) and European Foundation for Quality Management (“EFQM”) guidelines.

  • Non-Executive Director Remuneration Objective The Board seeks to set aggregate remuneration at a level that provides the Company with the ability to attract and retain directors of the highest calibre, whilst incurring a cost that is acceptable to shareholders.

  • These requirements are set out in “Part Three – Cabinet Office Efficiency and Reform Group requirements” below.

Related to Cabinet Office Efficiency and Reform Group

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Public Finance Management Act ’ means the Public Finance Management Act, 1999 (Act No. 1 of 1999);

  • Municipal Finance Management Act means the Local Government: Municipal Finance Management Act, 2003 (Act No. 56 of 2003);

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • high-efficiency cogeneration means cogeneration meeting the criteria laid down in Annex II;

  • Maritime agency services means activities consisting in representing, within a given geographic area, as an agent the business interests of one or more shipping lines or shipping companies, for the following purposes:

  • M2M Flowgate means Flowgates where constraints are jointly monitored and coordinated as defined and set forth in Schedule D to this Agreement.

  • Energy efficiency portfolio standard means a requirement to

  • Drug therapy management means the review of a drug therapy regimen of a patient by one or more pharmacists for the purpose of evaluating and rendering advice to one or more practitioners regarding adjustment of the regimen.

  • Cold Weather Alert means the notice that PJM provides to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for expected extreme cold weather conditions.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Burswood Casino means those premises in the Resort Complex identified in the Drawings as the areas to constitute the casino and includes areas in which money counting, surveillance, storage and other activities related to the conduct and playing of Games are carried on; and

  • Graywater means untreated wastewater that has not been contaminated by any toilet discharge, has not been affected by infectious, contaminated, or unhealthy bodily wastes, and does not present a threat from contamination by unhealthful processing, manufacturing, or operating wastes. “Graywater” includes, but is not limited to, wastewater from bathtubs, showers, bathroom washbasins, clothes washing machines, and laundry tubs, but does not include wastewater from kitchen sinks or dishwashers. Health and Safety Code Section 17922.12.

  • Cathodic protection tester means a person who can demonstrate an understanding of the principles and measurements of all common types of cathodic protection systems as applied to buried or submerged metal piping and tank systems. At a minimum, such persons must have education and experience in soil resistivity, stray current, structure-to-soil potential, and component electrical isolation measurements of buried metal piping and tank systems.

  • Electrical protection barrier means the part providing protection against any direct contact to the high voltage live parts.

  • Transportation Company means any organization which provides its own or its leased vehicles for transportation or which provides freight forwarding or air express services.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Best Management Practices (BMPs means schedules of activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the state. BMPs also include treatment requirements, operating procedures, and practices to control site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw material storage.

  • Transportation network company rider or “rider” means an

  • Urgent Care means treatment for a condition that is not a threat to life or limb but does require prompt medical attention. Also, the severity of an urgent condition does not necessitate a trip to the hospital emergency room. An Urgent Care facility is a freestanding facility that is not a physician’s office and which provides Urgent Care.

  • Plug-in Hybrid Electric Vehicle (PHEV) means a vehicle that is similar to a Hybrid but is equipped with a larger, more advanced battery that allows the vehicle to be plugged in and recharged in addition to refueling with gasoline. This larger battery allows the car to be driven on a combination of electric and gasoline fuels.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • ITB means Instructions to Bidders;

  • Best management practice (BMP) means a structural device or nonstructural practice designed to temporarily store or treat stormwater runoff in order to mitigate flooding, reduce pollution, and provide other amenities.

  • Asset Management Plan means a strategic document that states how a group of assets are to be managed over a period of time. The plan describes the characteristics and condition of infrastructure assets, the levels of service expected from them, planned actions to ensure the assets are providing the expected level of service, and financing strategies to implement the planned actions. The plan may use any appropriate format, as long as it includes the information and analysis required to be in a plan as described in Ontario’s Building Together: Guide for Asset Management Plans.