Center of reference definition

Center of reference means the intersection of the axis of reference with the exterior light-emitting surface, specified by the manufacturer of the lamp;
Center of reference means the intersection of the axis of reference with the exterior light-emitting surface, specified by the manufacturer of the lamp.

Related to Center of reference

  • Terms of Reference (TOR) means the document included in the RFP as Section 5 which explains the objectives, scope of work, activities, tasks to be performed, respective responsibilities of the Client and the Consultant, and expected results and deliverables of the assignment.

  • Terms of Reference (TORs) means the Terms of Reference that explains the objectives, scope of work, activities, and tasks to be performed, respective responsibilities of the Procuring Entity and the Consultant, and expected results and deliverables of the assignment.

  • Terms of Reference (TOR) means the document included in the RFP which explains the scope of work, activities and tasks to be performed.

  • the book of reference means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;

  • Underlying Reference means as set out in §26(a) above.

  • Letter of RFP means the letter of invitation being sent by the Procuring Entity to the Consultants.

  • angle of repose means the steepest angle of a surface at which a mass of loose or fragmented material will remain stationary in a pile on the surface, rather than sliding or crumbling away;

  • Standard reference compendia means the American Medical Association Drug Evaluations, the

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.