Completion of a Well means that the well has been adequately worked to be capable of producing oil or gas or that well testing as required by the division has been concluded.
Completion of a Well means that the well has been
Completion of a Well means that the well has been "Natural Gas" means those hydrocarbons, other than oil and adequately worked to be capable of producing oil or gas or that well other than natural gas liquids separated from natural gas, that occur testing as required by the division has been concluded. naturally in the gaseous phase in the reservoir and are produced and "Confining Strata" refers to a body of material that is relatively recovered at the wellhead in gaseous form. Natural gas includes

Examples of Completion of a Well in a sentence

  • After Completion of a Well, the Operator may submit a request to the Building Official to reduce the existing bond to ten thousand dollars ($10,000) for the remainder of the time the Well produces without reworking.

  • Such notice is required only where final Reclamation operations commence more than thirty (30) days after the Completion of a Well.

  • Development Area: means the subsurface area from which Operator intends to extract oil, gas and other resources.Drilling Fluid: means the fluid mixture of water, mud, oil, and chemicals used to lubricate the drill bit during drilling operations.Drilling Pits: means those Pits used during drilling operations and initial Completion of a Well, and include:1.

  • Only Closed Loop Systems shall be used during drilling and Completion of a Well.

  • Whilst such examples specific to the U.K. provide encouragement, the detail of their formulation, operation and degree of success is poorly understood, or at least the public domain is not privy to such insight.

  • In the case of a new Well, the water meter shall be installed upon Completion of a Well.

  • OGED: means the Weld County Oil and Gas Energy OGED.OGED Director: means the Director of the Weld County Oil and Gas Energy OGED.Drilling Pits: means those Pits used during drilling operations and initial Completion of a Well, and include:1.

  • Only Closed Loop Systems that meet or exceed the requirements of NMAC 19.15.1.21 shall be used during drilling and Completion of a Well.


More Definitions of Completion of a Well

Completion of a Well means the date after treatment, if any, that the well is properly equipped for production of oil or gas; or if the well is dry, the date the well is abandoned. ((24) added July 31, 1968, P.L.881, No.265)

Related to Completion of a Well

  • Completion of work means completion of the entire contracted work. Exhaustion of quantity of any particular item mentioned in the bid document shall not imply completion of work or any component thereof.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Substantial Completion Date means the required date for Substantial Completion of the Project. The Substantial Completion Date can be adjusted only by written Change Order.

  • Completion Period means the period starting from the date of issue of "Order" and required to complete the work in all respect.

  • service well means a well drilled or completed for the purpose of supporting production in an existing field. Wells in this class are drilled for the following specific purposes: gas injection (natural gas, propane, butane or flue gas), water injection, steam injection, air injection, salt water disposal, water supply for injection, observation or injection for combustion.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Test Well means a well constructed for the purpose of obtaining information needed to design a well prior to its construction. Test wells are cased and can be converted to observation or monitoring wells and under certain circumstances to production wells

  • Tests after Completion means the tests (if any) which are specified in the Contract and which are carried out in accordance with the Specification after the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Construction Work means any work in connection with⎯

  • Guaranteed Substantial Completion Date or “Guaranteed Substantial Completion Dates” has the meaning set forth in Section 5.3B.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Development Well means a well drilled inside the established limits of an oil or gas reservoir, or in close proximity to the edge of the reservoir, to the depth of a stratigraphic horizon known to be productive.

  • Subproject means a Subproject under the Project that meets the Subproject eligibility criteria set forth in paragraph 2 of Schedule 5 to this Loan Agreement;

  • Completion Notice means a notice issued by the Developer in accordance with clause 6.1.

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Horizontal well means a well bore drilled laterally at an angle of at least eighty (80) degrees to the vertical or with a horizontal projection exceeding one hundred (100) feet measured from the initial point of penetration into the productive formation through the terminus of the lateral in the same common source of supply.