Continuous emission monitoring system or "CEMS" means the equipment required under section 11 of this rule to sample, analyze, measure, and provide, by means of readings recorded at least once every fifteen (15) minutes, using an automated data acquisition and handling system (DAHS), a permanent record of nitrogen oxides emissions, stack gas volumetric flow rate, stack gas moisture content, and oxygen or carbon dioxide concentration, as applicable, in a manner consistent with 40 CFR 75*. The following systems are the principal types of continuous emission monitoring systems required under section 11 of this rule:
Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);
CAISO-Approved Meter means a CAISO approved revenue quality meter or meters, CAISO approved data processing gateway or remote intelligence gateway, telemetering equipment and data acquisition services sufficient for monitoring, recording and reporting, in real time, all electric energy produced by the Generating Facility less Station Use.
Interim Monitor means any monitor appointed pursuant to Paragraph III of this Order or Paragraph III of the related Order to Maintain Assets.
Fraud Monitoring System means an off-line administration system that monitors suspected occurrences of ABT- related fraud.
Condition Satisfaction Date shall have the meaning set forth in Section 7.2.
Environmental Compliance Reserve means any reserve which the Agent establishes in its reasonable discretion after prior written notice to the Borrower from time to time for amounts that are reasonably likely to be expended by the Borrower in order for the Borrower and its operations and property (a) to comply with any notice from a Governmental Authority asserting material non-compliance with Environmental Laws, or (b) to correct any such material non-compliance identified in a report delivered to the Agent and the Lenders pursuant to Section 7.7.
Construction management at-risk means a project delivery method in which the District awards separate contracts, one for architectural and engineering services to design an infrastructure facility and the second to a construction manager at-risk for both construction of the infrastructure facility according to the design and construction management services.
Performance Requirements The ordering entity reserves the right to inspect and verify that all deliveries are in accordance with specifications, both at the point of delivery and at the point of use. For orders that specify an “authorized party” to receive and inspect deliveries and/or installations, acceptance and inspection procedures must be performed by the” authorized party” to be considered and accepted by the ordering entity. Products inspected at the time of use are subject to refusal and return requirements for issues of quality such as defects in manufacturing and/or workmanship. Products will not be considered accepted by the ordering entity until the installation is complete for the applicable products.
Environmental Site Assessment means a Phase I environmental report meeting the requirements of the American Society for Testing and Materials, and, if in accordance with customary industry standards a reasonable lender would require it, a Phase II environmental report, each prepared by a licensed third party professional experienced in environmental matters.
Phase I Environmental Site Assessment is an assessment of the environmental condition of the Property performed in accordance with the American Society of Testing and Materials (ASTM) Standard E1527-05 “Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process,” or any successor to such ASTM Standard which is active at the time of the assessment.
Site Assessment means an environmental assessment report for the Mortgaged Property prepared at Borrower’s expense by a qualified environmental consultant engaged by Borrower, or by Lender on behalf of Borrower, and approved by Lender, and in a manner reasonably satisfactory to Lender, based upon an investigation relating to and making appropriate inquiries to evaluate the risks associated with Mold and any existence of Hazardous Materials on or about the Mortgaged Property, and the past or present discharge, disposal, release or escape of any such substances, all consistent with the most current version of the ASTM 1527 standard (or any successor standard published by ASTM) and good customary and commercial practice.