Examples of Constructional defect in a sentence
Participation by conference calls shall constitute presence in person at a meeting.
Participation by conference calls shall constitute presence in person at a meeting.
Construction defect means a deficiency in or a deficiency arising out of the design, specifications, surveying, planning, supervision, or observation of construction or construction of residential improvements that results from any of the following:
Environmental Defect means, with respect to any given Asset, a material violation of Environmental Laws in effect as of the Effective Time in the jurisdiction in which such Asset is located.
Environmental Defect Notice shall have the meaning set forth in Section 12.1(a).
Latent Defect means a defect, inherently lying within the material or arising out of design deficiency, which do not manifest themselves and/or was not reasonably discoverable during Defect Liability period.
Environmental Defect Value means, with respect to any Environmental Defect, the value, as of the Closing Date, of the estimated costs and expenses to correct such Environmental Defect in the most cost-effective manner reasonably available, consistent with Environmental Laws, taking into account that non-permanent remedies (such as mechanisms to contain or stabilize hazardous materials, including monitoring site conditions, natural attenuation, risk-based corrective action, institutional controls or other appropriate restrictions on the use of property, caps, dikes, encapsulation, leachate collection systems, etc.) may be the most cost-effective manner reasonably available.
Major Defect means a condition that exists on a ground ambulance vehicle that requires the Department or the certificate holder to place the ground ambulance vehicle out-of-service.
Material Defect As defined in Section 2.02(c) hereof.
Minor defect means a defect which is not a Major Defect.
Nonconformance as used in this clause means a condition of any hardware, software, material, or service/workmanship in which one or more characteristics do not conform to requirements.
Document Defect As defined in Section 2.03(a).
construction site means a workplace where construction work is being performed;
Latent Defects means such defects caused by faulty designs, material or work-man- ship which cannot be detected during inspection, testing etc, based on the technology available for carrying out such tests.
Nonconformity or “Nonconformities” means any failure or failures of the Software to conform to the requirements of this Contract, including any applicable Documentation.
Defect Notice shall have the meaning specified in Section 3.2 of this Agreement.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Title Defect means with respect to a Lease any lien, encumbrance, adverse claim, default, expiration, failure, defect in or objection to real property title, other than Permitted Encumbrances, that alone or in combination with other defects renders Sellers’ title to the Lease less than Defensible Title.
Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.
Punchlist means a list of items of Work to be completed or corrected by Contractor after Substantial Completion. Punchlists indicate items to be finished, remaining Work to be performed, or Work that does not meet quality or quantity requirements as required in the Contract Documents.
Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.
Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,
Environmental Condition means any condition or circumstance, including the presence of Hazardous Substances which does or would (i) require assessment, investigation, abatement, correction, removal or remediation under any Environmental Law, (ii) give rise to any civil or criminal Liability under any Environmental Law, (iii) create or constitute a public or private nuisance or (iv) constitute a violation of or non-compliance with any Environmental Law.
Construction project means the same as that term is defined in Section 38-1a-102.
Environmental Conditions means the presence in the environment, including the soil, groundwater, surface water or ambient air, of any Hazardous Material at a level which exceeds any applicable standard or threshold under any Environmental Law or otherwise requires investigation or remediation (including, without limitation, investigation, study, health or risk assessment, monitoring, removal, treatment or transport) under any applicable Environmental Laws.
Correctional facility means a facility operated under the management and control of the Virginia Department of Corrections.
Congenital Condition(s) means (a) any medical, physical or mental abnormalities existed at the time of or before birth, whether or not being manifested, diagnosed or known at birth; or (b) any neo-natal abnormalities developed within six (6) months of birth.
Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.