Examples of Cross section in a sentence
Longitudinal and cross sections for major and minor streams shall cover Cross section of the channel at the site of proposed crossing and few cross sections at suitable distance both upstream and downstream, bed level upto top of banks and ground levels to a sufficient distance beyond the edges of channel, nature of existing surface soil in bed, banks & approaches, longitudinal section of channel showing site of bridge etc.
Cross section shall be taken normal to the centre line at as close intervals as necessary and practicable, but in any case not more than 5 m.
Category A - Environmentally Sensitive Areas 35Category B - Environmentally Sensitive Areas 36Category C - Environmentally Sensitive Areas 38APPENDIX B – FORMS 39FORM 1 Monitoring and Record Keeping Summary 39FORM 2 Emergency Response Table 41FORM 3 Schedule of Rehabilitation Costs 42Figure 1 - Cross section through a watercource 43Figure 2 - Plan view of a watercourse 44 1.0 INTRODUCTIONNote: The key terms and/or phrases used in this Code are highlighted in italics followed by an (*).
Cross section roof drawings shall be provided at the building permit stage indicating the relative height of the screen wall or parapet.
Cross section lines shown on the FIRM may also be labeled with the BFE rounded to 0.1 foot.
Longitudinal and cross sections for major and minor streams shall cover Cross section of the channel at the site of proposed crossing and few cross sections at suitable distance both upstream and downstream, bed levelupto top of banks and ground levels to a sufficient distance beyond the edges of channel, nature of existing surface soil in bed, banks & approaches, longitudinal section of channel showing site of bridge etc.
Table 1.11 Cross-sections for earthing conductors Cross- section of outer2.4.4 Machines and devices which are insulated mounted are to be earthed by flexible cables, wires or stranded copper straps.
Cross section of roads at four places showing clear road width, distance left from building line, spaces left for plantation, footpath, service lines etc.
Cross section square wooden supports– minimum 3 pcs for Double axle and 4 for triple axle and one such support for every 10 feet for length ODC trailer.
Cross section elevation information should also be included in the FIRM Database for unmapped cross sections in model-backed Zone A areas for all modeled frequencies.