Austin Western, Grove and machines of a similar nature, Scoopmobiles, Monorails, Conveyors, Trenchers: Loaders-Rubber Tired and Tractor: ▇▇▇▇▇▇ ▇▇▇▇▇▇ and Eimco Loaders and Eimco Backhoes; Mighty Midget and similar breakers and Tampers, Curb and Gutter Pavers and Motor Patrol, Motor Graders and all machines of a similar nature.
Usable Width3 Curb and Gutter WB Offsets to face of curb WB thru lanes Turn lanes EB thru lanes EB Offsets to face of curb Curb and Gutter Sidewalk & Min.
Cylinders KT-22 Bridge Decks Minimum 1 set of seven 6”x12” cylinders and one 4”x8” cylinder per 100 yd3 or major mix design change Structures Minimum 1 set of 7 per 100 yd3 Sidewalk and Flatwork Minimum 1 set of 7 per 500 yd2 Curb and Gutter Minimum 1set of 7 per 500 lf All cylinders shall be tested for compressive strength in accordance with ASTM C 39-05 at the following intervals: Two cylinders each at 7 days, 14 days, and 28 days.
If a CCC has been issued for the Paved Roads, Sidewalks, Curb and Gutter or the Separate Sidewalks, the Owners shall take all reasonable steps to ensure that the roads and sidewalks are not open for use by the public until the Street Lighting System is operational and energized to the satisfaction of the City.
Curb and Gutter will be installed per the City of ▇▇▇▇▇▇▇▇ Standards in place at time of construction.
The Employers agree that they will subcontract Concrete Curb and Gutter, Concrete and Paver Sidewalk, and the laying of asphalt only to subcontractors who employ members in good standing.
E19.1 All catch basins shall be supplied with AP-008 Barrier Curb and Gutter Inlet Frame and Box with AP-009 Barrier Curb and Gutter Inlet Cover unless otherwise directed by the Contract Administrator.
Notes Plus SDDANR requirements • Erosion Control Plan Sheets • Typical Sections • Removal Plan Sheets • Plan & Profile Sheets • Curb and Gutter & Surfacing Sheets • Pavement Marking Sheets • Permanent Signing Sheets • Standard City and SD DOT (as needed) Details • Special Project Details • Cross Section Sheets • Electrical Plan Sheets and Details The total number and/or type of sheets may vary upon final design depending on final project requirements.
Direct unit cost of major works is shown in Table 7.9.2. Item Description Unit Direct Unit Cost (Peso) CLEARING AND GRUBBING Clearing and Grubbing sq.m. 48.21 REMOVAL OF STRUCTURES AND OBSTRUCTIONS Removal of Existing Concrete Curb and Gutter ▇.▇.
Exterior Concrete Sidewalks, Curb and Gutter Contractor will furnish and install all exterior concrete work.