Examples of Dedicated Circuit in a sentence
Maximum Available Minutes" is the total number of minutes that a given Dedicated Circuit is linked to one or more Virtual Networks in Azure during a billing month in a given Azure subscription.
Interface between Data Terminal Equipment (DTE) and Data Circuit-Terminating Equipment (DCE) for Terminals Operating in the Packet Mode and Connected to Public Data Networks by Dedicated Circuit.
Maximum Available Minutes" is the total number of minutes that a given Dedicated Circuit is linked to one or more Virtual Networks in Windows Azure during a billing month in a given Windows Azure subscription.
X.25, (1984), Interface Between Data Terminal Equipment (DTE) and Data Circuit- terminating equipment (DCE) for Terminals Operating in the Packet Mode and Connected to Public Data Networks by Dedicated Circuit, Section 2, 3 and 4.
A minute is considered unavailable for a given Dedicated Circuit if all attempts by Customer within the minute to establish IP-level connectivity to the Virtual Network Gateway associated with the Virtual Network fail for longer than thirty seconds.
Those single phase New Connection customers installing an approved off-peak storage electric hot water service can chose to connect via use of a single phase single element meter on a Time of Use Network Tariff or access a Dedicated Circuit Controlled Load Tariff arrangement through via use of a single phase two element meter and relevant Network Tariffs such as C1RCDS in CitiPower or D1DD1 in Powercor.
Multiphase meters are only available in a single element form, and consequently New Connection customers cannot access a Dedicated Circuit Load Control Tariff, and hence those sites using load control are recommended to apply for a ToU tariff such as Flexi tariff C13R in CitiPower or P13R in Powercor.
Site Power Requirements: • Dedicated Circuit • Surge Protection • Ample Power Outlets for new equipment A minimum of a 15A dedicated circuit will be required for basic installation.
For those Single phase New Connection customers with an approved off-peak Electric Hot Water service and requesting access to a Dedicated Circuit Controlled Load Tariff arrangement, will be undertaken via a single phase two element Meter, with the HWS connected to the meter’s contactor (inclusive of boost tails if permitted by the retailer), with the HWS consumption charged at the Dedicated Circuit Network Tariff off-peak rate, including any HWS top element “re-heat”.
Apart from Ganzeboom other researchers take into account this effect.