Cannabis testing facility means an entity registered by
Pump spray means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger or other actuator.
RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.
Stinger-steered automobile or watercraft transporter means an automobile or watercraft transporter
Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.
Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per million.
Livery vehicle means a motor vehicle that:
Transit Traffic means traffic originating on CLEC’s network that is switched and transported by AT&T-TSP and delivered to a Third Party Terminating Carrier’s network or traffic from a Third Party Originating Carrier’s network. A call that is originated or terminated by a CLEC purchasing local switching pursuant to a commercial agreement with AT&T-TSP is not considered Transit Traffic for the purposes of this Attachment. Additionally Transit Traffic does not include traffic to/from IXCs.
INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.
Service Switching Point (SSP) is a telephone central office switch equipped with a Signaling System 7 (SS7) interface.
Transport vehicle means a motor vehicle or rail car used for the transportation of cargo by any mode. Each cargo-carrying body (trailer, railroad freight car, etc.) is a separate transport vehicle.
DNS test Means one non-‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.
Ethanol blended gasoline means the same as defined in section 214A.1.
Cold Weather Alert means the notice that PJM provides to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for expected extreme cold weather conditions.
Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".
Service Switching Point (SSP) means the telephone Central Office Switch equipped with a Signaling System 7 (SS7) interface.
Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.
Non-Administrator Dialysis Facility means a Dialysis Facility which does not have an agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan but has been certified in accordance with the guidelines established by Medicare.
Residual disinfectant concentration (“C” in CT cal- culations) means the concentration of disinfectant measured in mg/l in a representative sample of water.
Cannabis processing facility means a person that:
Reference evapotranspiration or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given expressed in inches per day, month, or year as represented in Appendix C of these Guidelines, and is an estimate of the evapotranspiration of a large field of four to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the Maximum Applied Water Allowances.
Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.
Signaling Transfer Point (“STP”) means a signaling point that performs message routing functions and provides information for the routing of messages between signaling points within or between CCIS networks. A STP transmits, receives and processes CCIS messages.
Self-service storage facility or "facility" means any real property designed or used for the purpose of renting or leasing individual storage space to tenants who are to have access to that space for the purpose of storing and removing personal property.