Domgas Project Pipeline Licence definition

Domgas Project Pipeline Licence means the licence granted or to be granted (as the case may be) to the Joint Venturers under the Pipelines Act (as modified by this Agreement) and in accordance with clause 15(1)(a) for the construction, operation and maintenance of the Domgas Project Pipeline, as varied from time to time in accordance with the Pipelines Act (as modified by this Agreement).

Related to Domgas Project Pipeline Licence

  • Gathering System means that portion of Gatherer’s pipeline system, including all appurtenances thereto, related to the provision of gathering and transportation services provided by Gatherer pursuant to this tariff.

  • Pipeline means any pipe, pipes, or pipelines used for the intrastate transportation or transmission of any solid, liquid, or gaseous substance, except water.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Pipeline System means each system of Pipeline Assets, Real Property and Easements relating thereto making up an integrated gathering system and gathering system, or other pipeline system.

  • Pipelines has the meaning set forth in the Recitals.

  • Transportation project or "project" means any or the

  • Refinery means a facility used to produce motor fuel from crude oil, unfinished oils, natural gas liquids, or other hydrocarbons and from which motor fuel may be removed by pipeline, by marine vessel, or at a rack.

  • Production Burdens means any royalties (including lessor’s royalties), overriding royalties, production payments, net profit interests or other similar interests that constitute a burden on, and are measured by or are payable out of, the production of Hydrocarbons or the proceeds realized from the sale or other disposition thereof (including any amounts payable to publicly traded royalty trusts), but excluding Taxes and assessments of Governmental Entities.

  • Dedicated Transport means CenturyLink transmission facilities between Wire Centers or switches owned by CenturyLink, or between Wire Centers or switches owned by CenturyLink and switches owned by CLEC, including, but not limited to, DS1, DS3, and OCn-capacity level services, as well as Dark Fiber, dedicated to a particular End User Customer or carrier.

  • Gas well means a well producing gas or natural gas from a common source of gas supply as determined by the commission.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Supply Pipe means any part of a service pipe which a water undertaker could not be, or have been required to lay under section 46 of the Water Industry Act 1991; and

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Capacity Transmission Injection Rights means the rights to schedule energy and capacity deliveries at a Point of Interconnection of a Merchant Transmission Facility with the Transmission System. Capacity Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility and/or Controllable A.C. Merchant Transmission Facilities that connects the Transmission System to another control area. Deliveries scheduled using Capacity Transmission Injection Rights have rights similar to those under Firm Point-to-Point Transmission Service or, if coupled with a generating unit external to the PJM Region that satisfies all applicable criteria specified in the PJM Manuals, similar to Capacity Interconnection Rights.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.

  • Project Area means land or lands located within the incentive

  • Power plant means a facility for the generation of

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • CO2 means carbon dioxide.

  • mining area means all those pieces of land containing two hundred and forty‑six (246) square miles or thereabouts situate in what is known to the parties as the “Xxx Xxxxx‑Siberia Nickel Laterite Area” the subject of the mineral claims applications for mineral claims and Temporary Reserves listed in the First Schedule hereto which are generally delineated and respectively coloured green and orange and red in the plan marked “X” signed by or on behalf of the parties for the purpose of identification;

  • Energy Transmission Injection Rights means the rights to schedule energy deliveries at a specified point on the Transmission System. Energy Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility that connects the Transmission System to another control area. Deliveries scheduled using Energy Transmission Injection Rights have rights similar to those under Non-Firm Point-to-Point Transmission Service.