Examples of Downstream toe in a sentence
The current USACE design criteria (EM 1110-2-1901) generally requires: • Downstream toe of dam FSpiping ≥3.0 • Toe of a downstream seepage berm FSpiping ≥1.5The material properties used in the seepage and stability analyses were derived from the lab and field testing performed during the geotechnical exploration, historical data from the site, and correlated values with published data when necessary.