East Link Light Rail Project definition

East Link Light Rail Project means the construction of approximately 14.5 miles of double-track light rail connecting the Cities of Seattle, Xxxxxx Island, Bellevue and Overlake/Redmond in King County, Washington. This extension will connect to the existing rail system of the Borrower at the International District/Chinatown Station which runs from downtown Seattle to SeaTac Airport (and is currently being extended north to the University of Washington and south to S. 200th St in SeaTac, WA by another project not the subject of this Agreement). The East Link Light Rail Project includes: ten intermodal stations (located at Rainier Ave, Xxxxxx Island, South Bellevue, East Main Street, Bellevue Transit Center, Hospital Station, 120th Ave, 130th Ave, Overlake Village and Overlake Transit Center), 46 light rail vehicles, and pedestrian and bicycle improvements. The light rail alignment involves a combination of at-grade (including 1.1 miles on the existing I-90 floating bridge), below-grade and above-grade sections. Additional parking at three stations will add approximately 2000 stalls to the existing parking as follows: at the South Bellevue Station, construction of a parking garage with approximately 1400 stalls as well as bus-transfer facilities; at the 130th Avenue Station, located between 130th Avenue NE and 132nd Avenue NE, construction of a new 300 stall park-and-ride adjacent and immediately to the north of the Overlake Transit Center Station. The Overlake Transit Center will be rebuilt to accommodate light rail and approximately 300 parking stalls and improved bus-transfer facilities. FTA has oversight of the East Link Light Rail Project.

Examples of East Link Light Rail Project in a sentence

  • The Borrower shall not, without the prior written consent of the TIFIA Lender enter into any Additional Project Contract that commits the Borrower to spend, or is reasonably expected to involve expenditures by the Borrower of, an amount that, when aggregated with Total Project Costs for the East Link Light Rail Project incurred or committed to date, would cause such Total Project Costs to exceed the Total Project Costs reflected in Schedule IA of the Project Budget by more than five percent (5%).

  • The Borrower is in compliance in all material respects with, and has conducted (or caused to be conducted) its public transit operations and the implementation of the East Link Light Rail Project in compliance in all material respects with, all applicable laws (other than Environmental Laws, which are addressed in clause (s) of this Section 13), including the FTA Master Agreement.

  • The Borrower shall use the East Link Light Rail Project solely for public transportation purposes and such incidental uses as approved by the FTA Regional Office and the TIFIA Lender.

  • The intent of this peer review is to analyze the new information, new Alternatives and design modifications, related to the noise and vibration aspects of the East Link Light Rail Project, as presented in the Supplemental Draft Environmental Impact Statement (SDEIS).

  • The FTA Regional Office has oversight responsibility for the Project, including ensuring compliance in all material respects with all applicable provisions of federal transportation law and for project oversight activities for the East Link Light Rail Project, including compliance with the terms of the FTA Master Grant Agreement and, to the extent applicable federal law.

  • The Borrower, having received FTA grant funds for the East Link Light Rail Project, shall at all times abide by shall comply in all material respects with all applicable federal and State laws, including (i) all items set forth on Exhibit I to the extent applicable and (ii) the terms and conditions of the FTA Master Agreement, which has no expiration date and which continues to apply until modified or superseded as outlined therein.

  • On November 12, 2008, voters approved expansion of Sound Transit (ST2), including the East Link Light Rail Project.

Related to East Link Light Rail Project

  • Cogeneration facility means a power plant in which the heat or steam is also used for industrial or commercial heating or cooling purposes and that meets Federal Energy Regulatory Commission standards for qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16

  • Stand Alone System Upgrade Facilities means System Upgrade Facilities that a Developer may construct without affecting day-to-day operations of the New York State Transmission System during their construction. NYISO, the Connecting Transmission Owner and the Developer must agree as to what constitutes Stand Alone System Upgrade Facilities and identify them in Appendix A to this Agreement.

  • Trunk line means the coaxial/optic fiber cable network and other allied equipment such as receiver nodes, amplifiers, splitters etc. owned and installed by the multi-system operator or its associate companies for the purpose of transmitting Cable TV Signal to various LCOs till the receiving end of various LCOs, including the LCO, to enable them to re-transmit the Cable TV Signal to respective subscribers; All other words and expressions used in this interconnection agreement but not defined, and defined in the Act and rules and regulations made thereunder or the CTN Act and the rules and regulations made thereunder, shall have the meanings respectively assigned to them in those Acts or the rules or regulations, as the case may be.

  • Retail Property means a Property improved with a building or buildings the substantial use of which is retail space, which may include a Property that is part of a Mixed-Use Property.

  • Infrastructure facility means a building; structure; or networks of buildings, structures, pipes, controls, and equipment, or portion thereof, that provide transportation, utilities, public education, or public safety services. Included are government office buildings; public schools; courthouses; jails; prisons; water treatment plants, distribution systems, and pumping stations; wastewater treatment plants, collection systems, and pumping stations; solid waste disposal plants, incinerators, landfills, and related facilities; public roads and streets; highways; public parking facilities; public transportation systems, terminals, and rolling stock; rail, air, and water port structures, terminals, and equipment.

  • Micro wireless facility means a small cell facility that is not larger in dimension than 24 inches in length, 15 inches in width, and 12 inches in height and that has an exterior antenna, if any, not longer than 11 inches.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • generation facility means a facility for generating electricity or providing ancillary services, other than ancillary services provided by a transmitter or distributor through the operation of a transmission or distribution system, and includes any structures, equipment or other things used for that purpose;

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Fuel burning equipment means any furnace, boiler, apparatus, stack and all associated equipment, used in the process of burning fuel.

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • Electric Facility means a Generator or an electric transmission facility.

  • Electric bicycle means a “class 1 electric bicycle”, a “class 2 electric bicycle”, or a “class 3 electric bicycle” as defined in this section. (ORC 4511.01(RRR))

  • Cannabis processing facility means a person that:

  • Acquisition Facility the Acquisition Facility Commitments and the extensions of credit thereunder.

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Air navigation facility means any facility, other than one owned and operated by the United States, used in, available for use in, or designed for use in aid of air navigation, including any structures, mechanisms, lights, beacons, markers, communicating systems, or other instrumentalities or devices used or useful as an aid, or constituting an advantage or convenience to the safe taking off, navigation, and landing of aircraft, or the safe and efficient operation or maintenance of an airport, and any combination of any or all of such facilities.

  • Mid-Span Fiber Meet An Interconnection architecture whereby two carriers’ fiber transmission facilities meet at a mutually agreed upon point for the mutual exchange of traffic, subject to the trunking requirements and other terms and provisions of this Agreement. The “point” of Interconnection for purposes of 47 U.S.C §§251(c)(2) and 251(c)(3) remains on CenturyLink’s network and is limited to the Interconnection of facilities between the CenturyLink Serving Wire Center and the location of the CLEC switch or other equipment located within the area served by the CenturyLink Serving Wire Center. Minutes of Use: Shall be abbreviated as MOU. Multiple Exchange Carrier Access Billing (MECAB): The document prepared by the Billing Committee of the Ordering and Billing Forum (OBF), which functions under the auspices of the Carrier Liaison Committee (CLC) of the Alliance for Telecommunications Industry Solutions (ATIS). The currently effective version of the MECAB document, published by ATIS (0401004-00XX), contains the recommended guidelines for the billing of an Access Service provided by two or more LECs, or by one LEC in two or more states within a single LATA. National Emergency Number Association (NENA): A not-for-profit corporation established in 1982 to further the goal of “One Nation-One Number” for emergency calls. NENA is a networking source and promotes research, planning, and training. NENA strives to educate, set standards and provide certification programs, legislative representation and technical assistance for implementing and managing 911 systems.

  • Dry cleaning facility means an establishment with one or more dry cleaning systems.

  • Green infrastructure means a stormwater management measure that manages stormwater close to its source by:

  • Cogeneration unit means a unit that has equipment used to produce electric energy and forms of useful thermal energy (such as heat or steam) for industrial, commercial, heating or cooling purposes, through the sequential use of energy.

  • Development Location Point means a single point selected by the Applicant on the proposed Development site that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development. For a Development which consists of Scattered Sites, this means a single point on the site with the most units that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development.

  • Tanning facility means any premises, building, or part of a building that contains one or more rooms or booths with any of the following:

  • Gathering lines means any pipeline, equipment, facility, or building used in the transportation of oil or gas during oil or gas production or gathering operations.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.