Examples of Engineered Structure in a sentence
The Board also revise all the conditions containing this term.• Engineered Structure was revised to change Coarse Processed Kimberlite Containment Facility to Coarse Processed Kimberlite and Mine Rock Pile.• Minister was updated to the Board’s Standard Water Licence Condition.• Total Petroleum Hydrocarbons was included to clarify the analysis required by the Licence.
CIRNAC-GMRP have suggested that Borrow sources not be included in the definition of an Engineered Structure since they are already subject to several levels of regulatory review and oversight between the Board and GNWT and, in their view, should not be subject to additional inspections and plans required of Engineered Structures under Part E and F, condition 17 of the Draft Licence.
Still, the service now remains unaccommodating to fulfill a great number of subscribers/service users.
Engineered Structure - any structure or facility designed and approved by a Professional Engineer, including but not limited to the [enter list of structures/facilities] associated with the Project.
The Board has determined that the name of the facility be updated.• Engineered Structure – A list of site-specific structures/facilities is included in this definition and updated wording for one of the facilities was proposed by De Beers (Coarse Processed Kimberlite and Mine Rock Pile as described above).
The Sewage Disposal Facilities are defined as an Engineered Structure, therefore being subject to the conditions for Engineered Structures in Part E (i.e. submission and approval of Design and Construction Plans).
Design, Supply, Transportation and Installation of Pre Engineered Structure using anti rust Light Gauge Steel Frame, wall cladding, roofing, insulation, sunshades, soffits, coat of suitable primer etc.
The contained waste body is expected to become a more reducing environment, resulting in lower chromium VI concentrations.There will continue to be waste on the foreshore outside the Perimeter Engineered Structure, as described above.
The actual extent of wetted areas will be reduced as a result of the Perimeter Engineered Structure and its restriction of tidal inflow.The reduced introduction of water into the waste will reduce the infiltration of contaminated groundwater into the underlying alluvium.
The Licensee shall not commence Construction of the Engineered Structure prior to Board approval of the Plan.DESIGN AND CONSTRUCTION PLAN – MILL LAKE WATER TREATMENTFACILITY11.A minimum of 90 days prior to the commencement of Construction for the Tailings Containment Areas or Decommissioned Waste Dump, the Licensee shall submit to the Board, Repair Design Drawings stamped and signed by a Professional Engineer.