Extraction of coal as an incidental part definition

Extraction of coal as an incidental part means the extraction of coal which is necessary to enable the construction to be accomplished. For purposes of this rule, only that coal extracted from within the right-of-way and borrow areas, in the case of a road, railroad, utility line or other such construction, or within the boundaries of the area directly affected by other types of government-financed construction, may be considered incidental to that construction. Extraction of coal outside the right-of-way or
Extraction of coal as an incidental part means the extraction of coal that is necessary to enable the construction to be accomplished. Only that coal extracted from within the right-of-way, in the case of a road, railroad, utility line, or similar construction, or within the boundaries of the area directly affected by other types of government-financed construction, could be considered incidental to that construction. Extraction of coal outside the right-of-way or boundary of the area directly affected by the construction is subject to the requirements of KRS Chapter 350 and 405 KAR Chapters 7 through 24.
Extraction of coal as an incidental part means the extraction of coal that is necessary to enable the construction to be accomplished. For purposes of 62 Ill. Adm. Code 1703, only that coal extracted from within the right-of-way, in the case of a road, railroad, utility line or other such construction, or within the boundaries of the area directly affected by other types of government-financed construction, may be considered incidental to that construction. Extraction of coal outside the right-of-way or boundary of the area directly affected by the construction shall be subject to the requirements of the Act and 62 Ill. Adm. Code 1703.

Examples of Extraction of coal as an incidental part in a sentence

  • Extraction of coal as an incidental part of Federal, State or local government-financed highway construction pursuant to regulations promulgated by the Environmental Quality Board.

  • Extraction of coal as an incidental part means the extraction of coal which is neces- sary to enable the construction to be accom- plished.

  • Abandoned Mine Lands and Reclamation Enhancement Rule, as used in this part, the following definitions have the specific meaning; Definitions: Extraction of coal as an incidental part means the extraction of coal which is necessary to enable the construction to be accomplished.

  • Coal extraction] Extraction of coal as an incidental part of Federal, State or local government-financed highway construction pursuant to regulations promulgated by the Environmental Quality Board.

  • SECTION 707.5 DEFINITIONS5-29-80 As used in this Part, the following terms have the specified meaning: Extraction of coal as an incidental part means the extraction of coal which is necessary to enable the construction to be accomplished.

  • Extraction of coal as an incidental part of Federal, State or local government- financed highway construction pursuant to regulations promulgated by the Environmental Quality Board.

  • Extraction of coal as an incidental part of federal, state, or local government-financed highway or other construction under regulations established by the commission.

  • Extraction of coal as an incidental part of the government-financed construction which removes less than 250 tons of coal or affects less than two acres during the course of the operation is exempt from the Act and the regulations in this Chapter and may proceed without regard to this Part.

  • Extraction of coal as an incidental part means the extraction of coal which is necessary to enable the construction to be accomplished.

  • Extraction of coal as an incidental part-- The extraction of coal which is necessary to enable the construction to be accomplished.


More Definitions of Extraction of coal as an incidental part

Extraction of coal as an incidental part means for the purposes of Part 707 of this chapter, the extraction of coal which is necessary to enable the construction to be accomplished. For purposes of Part 707, only that coal extracted from within the right-of-way, in the case of a road, railroad, utility line or other such construction, or within the boundaries of the area directly affected by other types of government-financed construction, may be considered incidental to that construction. Extraction of coal outside the right-of-way or boundary of the area directly affected by the construction shall be subject to the requirements of the Act and this chapter.
Extraction of coal as an incidental part means, for the purposes of Part 707 of this chapter, the extraction of coal which is necessary to enable the construction to be accomplished. For purposes of Part 707, only that coal extracted from within the right-

Related to Extraction of coal as an incidental part

  • Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).

  • Area of shallow flooding means a designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate; and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.

  • Speech or language impairment means a communication disorder, such as stuttering, impaired articulation, a language impairment, or a voice impairment, that adversely affects a child’s educational performance.

  • Modular building means, but shall not be limited to, single and multifamily houses, apartment

  • CAFRA Centers, Cores or Nodes means those areas with boundaries incorporated by reference or revised by the Department in accordance with N.J.A.C. 7:7-13.16.

  • Has a record of such impairment means has a history of, or has been misclassified as having, a mental or physical impairment that substantially limits one or more major life activities.

  • Shipping container means a MIL-STD-129 defined exterior container that meets carrier regulations and is of sufficient strength, by reason of material, design, and construction, to be shipped safely without further packing (e.g., wooden boxes or crates, fiber and metal drums, and corrugated and solid fiberboard boxes).

  • Electric personal assistive mobility device means a self-balancing two-nontandem-wheeled device

  • Child in need of services means (i) a child whose behavior, conduct or condition presents or results

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Serialization within the part, lot, or batch number means each item of a particular part, lot, or batch number is assigned a unique serial number within that part, lot, or batch number assignment. The enterprise is responsible for ensuring unique serialization within the part, lot, or batch number within the enterprise identifier.

  • Roll coating means the application of a coating material to a substrate by means of hard rubber or steel rolls.

  • Deportation or forcible transfer of population means forced displacement of the persons concerned by expulsion or other coercive acts from the area in which they are lawfully present, without grounds permitted under international law;

  • Manufactured Home Park or Subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.

  • Air dried coating means a coating that is dried by the use of air or forced warm air at temperatures up to 1940F (900C).

  • Clear coating means a transparent coating designed to provide the final gloss and resistance properties of the coating system;

  • REASONABLY SAFE FROM FLOODING Means base flood waters will not inundate the land or damage structures to be removed from the floodplain and that any subsurface waters related to the base flood will not damage existing or proposed buildings.