Federal reclamation project definition

Federal reclamation project. ’ means a
Federal reclamation project. ’ means a water resources development project constructed, operated, and maintained pursuant to the Reclamation Act of 1902 (32 Stat. 388), and acts amendatory thereof and supplementary thereto;
Federal reclamation project. ’ means a water resources development project con- structed, operated, and maintained pursuant to the Reclamation Act of 1902 (32 Stat. 388), and acts amendatory thereof and supple- mentary thereto;

Examples of Federal reclamation project in a sentence

  • In addition, notwithstanding any other provi- sion of law, in the case of any Federal reclama-tion project authorized before October 12, 1982, any restriction prohibiting the delivery of irri- gation water for the production of excess basic agricultural commodities shall extend for a pe- riod no longer than ten years after the date of the initial authorization of such project.(Pub.

  • EQUUS BEDS DIVISION.The Act entitled ‘‘An Act to provide for the construction of the Cheney division, Wichita Federal reclamation project, Kan- sas, and for other purposes’’ (Public Law 86– 787; 74 Stat.

  • The State of Euphoria has a water supply it wishes to transport in the same direction and elevation as planned in the Federal reclamation project.

  • In addition, the budget narrative must provide detailed explanations of the type of salary requested, regular salary level, percentage of effort committed, campus guarantee of appropriate release, and justification in terms of project work to be performed for each individual requesting support.

  • The term `Central Arizona Project' or `CAP' means the Federal reclamation project authorized and constructed by the United States in accordance with title III of the Colorado River Basin Project Act (43 U.S.C. 1521 et seq.).

  • Addition- ally, this subsection provides that the operation, maintenance, and replacement of the facilities shall be the sole responsibility of the non-Federal parties and shall not be a project cost assignable to any Federal reclamation project.

  • Upon conveyance of the lands and facilities by the Secretary under this Act, the Humboldt Project shall no longer be a Federal reclamation project and the district shall not be entitled to receive any future reclamation benefits with respect to that project, except those benefits that would be available to other nonreclamation districts.

  • Upon conveyance of the lands and facilities by the Secretary under this Act, the transferred facilities and lands shall no longer be part of a Federal reclamation project and the Association and the District shall not be entitled to receive any future reclamation benefits with respect to the transferred facilities and lands, except those benefits that would be available to other nonreclamation facilities.

  • After conveyance of the Goleta Water Distribution System under this Act-- (1) such distribution system shall not be considered to be a part of a Federal reclamation project; and (2) the District shall not be eligible to receive any benefits with respect to any facility comprising the Goleta Water Distribution System, except benefits that would be available to a similarly situated entity with respect to property that is not part of a Federal reclamation project.

  • After conveyance of title under this Act-- (1) the conveyed property shall not be considered to be a part of a Federal reclamation project; and (2) the entity to which the property is conveyed shall not be eligible to receive any benefits, including Federal project power, with respect to the conveyed property, except for benefits that would be available to a similarly situated entity with respect to property that is not part of a Federal reclamation project.


More Definitions of Federal reclamation project

Federal reclamation project. ’ means a ater resources development project con- structed, operated, and maintained pursuant to the Reclamation Act of 1902 (32 Stat. 388), and acts amendatory thereof and supplementary

Related to Federal reclamation project

  • Transportation project or "project" means any or the

  • Reclamation plan means the operator's written proposal, as required and approved by the department, for reclamation of the land that will be disturbed. The proposal must include, to the extent practical at the time of application for an operating permit:

  • Reclamation means the United States Bureau of Reclamation.

  • Stormwater management system means any equipment, plants,

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Ex-situ conservation means the conservation of components of biological diversity outside their natural habitats.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Drainage system means one or more artificial ditches, tile drains or similar devices which collect surface runoff or groundwater and convey it to a point of discharge.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Wellhead protection area means the surface and subsurface area surrounding a water well or well field that supplies a public water system through which contaminants are reasonably likely to migrate toward the water well or well field.

  • Tourism destination project means a qualified non-gaming business facility that will be among the most visited privately owned or operated tourism or recreation sites in the State, and which is located within the qualified incentive area and has been determined by the authority to be in an area appropriate for development and in need of economic development incentive assistance, including a non-gaming business within an established Tourism District with a significant impact on the economic viability of that District.

  • Historic property means any prehistoric or historic site, district, building, object, or other real or personal property of historical, architectural, or archaeological value, and folklife resources. These properties or resources may include, but are not limited to, monuments, memorials, Indian habitations, ceremonial sites, abandoned settlements, sunken or abandoned ships, engineering works, treasure trove, artifacts, or other objects with intrinsic historical or archaeological value, or any part thereof, relating to the history, government, and culture of Florida.

  • Water conservation means the preservation and careful management of water resources.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Brownfield site means an abandoned, idled, or underutilized industrial or commercial facility where expansion or redevelopment is complicated by real or perceived environmental contamination. A brownfield site includes property contiguous with the property on which the individual or commercial facility is located. A brownfield site shall not include property which has been placed, or is proposed for placement, on the national priorities list established pursuant to the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. 9601 et seq.

  • Storm water or wastewater collection system means piping, pumps, conduits, and any other equipment necessary to collect and transport the flow of surface water run-off resulting from precipitation, or domestic, commercial, or industrial wastewater to and from retention areas or any areas where treatment is designated to occur. The collection of storm water and wastewater does not include treatment except where incidental to conveyance.

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • Environmental Assessment Act means the Environmental Assessment Act, R.S.O. 1990, c.E.18.

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Conservation easement means that term as defined in section 2140 of the natural resources and environmental protection act, 1994 PA 451, MCL 324.2140.

  • conservation area means the areas of the mineral lease within the solid black boundaries on Plan E being respectively the reserves known as ‘Xxxx’ ‘Serpentine’ and ‘Monadnock’, and parts of the reserve known as ‘Lane‑Xxxxx’;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Wastewater treatment plant means a facility designed and constructed to receive, treat, or store waterborne or liquid wastes.

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.