Access Tandem Switch is a Switch used to connect End Office Switches to interexchange Carrier Switches. Qwest's Access Tandem Switches are also used to connect and switch traffic between and among Central Office Switches within the same LATA and may be used for the exchange of local traffic.
Monitoring Period means the period from the Launch Date to the Valuation Date (both dates including) at such point in time at which the Reference Price of the Underlying is determined and published..
Programme Date means the date of this Base Prospectus.
fall prevention equipment means equipment used to prevent persons from falling from a fall risk position, inducing personal equipment, a body harness, lanyards, lifelines or physical equipment such as guard-rails, screens, barricades, anchorages or similar equipment;
Services Commencement Date means the date delivery of the Services shall commence as specified in the Key Provisions. If no date is specified in the Key Provisions this date shall be the Commencement Date;
Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.
Accumulation Commencement Date means January 1, 2021, or such later date as the Calculation Agent on behalf of the Issuer determines in accordance with Section 2.11 hereof.
Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.
Continuous monitoring system means the total equipment, required under the emission monitoring section in applicable subsections used to sample and condition (if applicable), to analyze, and to provide a permanent record of emissions or process parameters.
Deactivation Date means the date a generating unit within the PJM Region is either retired or mothballed and ceases to operate. Decrement Bid:
Implementation Period means the period from the date of signing of the Agreement and up to the issuance of Final Acceptance Certificate for the project.
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Large Workplace means a place at which on an average, 500 or more workers are employed.
Service Activation Date means the same as Activation Date.
Continuous emissions rate monitoring system or “CERMS” means the total equipment required for the determination and recording of the pollutant mass emissions rate (in terms of mass per unit of time).
Transition Period means the period beginning with the Registration Date and ending as of the earlier of: (i) the date of the first annual meeting of stockholders of the Company at which directors are to be elected that occurs after the close of the third calendar year following the calendar year in which the Registration Date occurs; and (ii) the expiration of the “reliance period” under Treasury Regulation Section 1.162-27(f)(2).
Barrier Observation Date means each of the Barrier Observation Dates as specified in § 1 of the Product and Underlying Data. If a Barrier Observation Date is not a Calculation Date for one or more Basket Components, the immediately following day, which is a Calculation Date shall be the respective Barrier Observation Date for all Basket Components.
approach control service means air traffic control service for arriving or departing controlled flights;
Employment Commencement Date means the date on which the Employee first performs an Hour of Service.
Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.
Service Period has the meaning given to it in Framework Schedule 4 (Template Order Form and Template Call Off Terms) as refined by a Contracting Body in a Call Off Agreement between that Contracting Body and the Supplier;
Nominal Rated Capability means the nominal maximum rated capability in megawatts of a Transmission Interconnection Customer’s Customer Facility or the nominal increase in transmission capability in megawatts of the Transmission System resulting from the interconnection or addition of a Transmission Interconnection Customer’s Customer Facility, as determined in accordance with pertinent Applicable Standards and specified in the Interconnection Service Agreement.
air traffic control service means a service provided for the purpose of:
area control service means air traffic control service for controlled flights in control areas;
major accident means an incident involving loss of life inside or outside the establishment or ten or more injuries inside and/or one or more injuries outside or release of toxic chemical or explosion or fire or spillage of hazardous chemical resulting in ‘on-site’ or ‘off-site’ emergencies or damage to equipment leading to stoppage of process or adverse effect to the environment;
Billing Commencement Date means the earlier of: