Flood Construction Level definition

Flood Construction Level means the lowest elevation recommended for construction of the underside of a wooden floor system or top of concrete slab for habitable buildings. Flood construction level is the observed or designated elevation for a flood having a 200‐year recurrence interval based on a frequency analysis of unregulated historic flood records plus an allowance for freeboard, generally in accordance with the following diagram:
Flood Construction Level means the designated flood level plus the allowance for freeboard and is used to establish the elevation of the underside of a wooden floor system or top of concrete slab for habitable buildings.
Flood Construction Level means the minimum elevation of the underside of any floor system, or the top of any pad supporting any space or room, including a manufactured home, that is used or could be used for dwelling purposes, business, or the storage of goods (including mechanical, electrical, and communication equipment) which are susceptible to damage by floodwater. [Bylaw 8340, November 4, 2013]

Examples of Flood Construction Level in a sentence

  • Floor area below the site specific Flood Construction Level (FCL) would be exempt from this calculation.

  • The findings of the Flood Construction Level definition work are provided in [13], which is referred to in this document as the FCL Study.

  • Where an approving officer considers a geodetic elevation necessary, the installation of benchmarks may be a condition of consent to subdivision approval in order to assist in the on-site determination of the Flood Construction Level.

  • Return period classes.Return Period (years)Annual Exceedance Probability200.05500.022000.0055000.002 Individual site reports include static copies of the following types of maps:• Flood hazard model scenario map (200-year flood depth)• Flood Construction Level (200-year flood elevation plus 0.6 m freeboard).

  • The individual site-assessment reports describe methods to prepare hazard maps for each area.In summary, BGC prepared two types of maps for the return period classes shown in Table 3-7: flood hazard model result maps and Flood Construction Level (FCL) maps.

  • Designated Flood Level - The observed or calculated elevation for the Designated Flood and is used in the calculation of the Flood Construction Level.

  • DESIGNATED FLOOD LEVEL: means an observed or calculated elevation for the Designated Flood, which is used in the calculation of the Flood Construction Level.

  • It is actively involved in regular, results-oriented, strategic, and self-reflective thinking and planning that aligns strategies with the mission and organizational capacity.

  • FCL where a designated flood level has not been determined – The Flood Construction Level should be no lower than 3.0 metres above the natural boundary of any nearby watercourse, except as allowed in section 3.2.3 and 3.2.4.

  • Flood Construction Level - The Designated Flood Level plus the allowance for freeboard and is used to establish the elevation of the underside of a wooden floor system or top of concrete slab for habitable buildings.


More Definitions of Flood Construction Level

Flood Construction Level or “FLOOD LEVEL” means a designated flood level plus freeboard, or where a designated flood level cannot be determined, a specified height above a natural boundary, natural ground elevation, or any obstruction that could cause ponding;
Flood Construction Level means the Designated Flood Level plus the allowance for freeboard and is used to establish the elevation of the underside of a wooden floor system or top of concrete slab for habitable buildings. In the case of a manufactured home, the ground level or top of concrete or asphalt pad on which it is located must be no lower than the above-described elevation. It also establishes the minimum crest level of a Standard Dike. Where the Designated Flood Level cannot be determined or where there are overriding factors, an assessed height above the natural boundary of the water body or above the Natural Ground Elevation may be used.
Flood Construction Level means the Designated Flood Level plus the allowance for freeboard and issued to establish the elevation of the underside of a wooden floor system or top of concrete slab for habitable buildings and areas. In the case of a manufactured home, the ground level or top of concrete or asphalt pad, on which it is located shall be equal to or higher than the above described elevation.
Flood Construction Level means the minimum elevation above the natural boundary of a water body to the underside of a floor system, or to the top of a slab on grade, for buildings located within an area that is subject to, or likely to be subject to, flooding. An area below flood construction level is not to be used for habitation, mechanical or electrical infrastructure, business or storage of goods damageable by flood water.
Flood Construction Level means the minimum elevation expressed in metres determined by reference to the G.S.C., below which no underside of any floor system, nor the top of any pad, supporting a Habitable Area shall be placed, constructed or located;

Related to Flood Construction Level

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • as constructed plans means as constructed plans as defined in the Building Code;

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Wellhead protection area means the surface and subsurface area surrounding a water well or well field that supplies a public water system through which contaminants are reasonably likely to migrate toward the water well or well field.