Held Load definition

Held Load means a load of SBWMA Construction and Demolition Debris

Examples of Held Load in a sentence

  • Within 8 Working Hours of the notification, the SBWMA will inform Contractor as to whether or not it is in agreement that the Held Load should be Rejected.

  • It is however quite possible that some of the information gaps and/or findings identified in this report may have been adequately addressed by EDC/PIC, but in the absence of documentary evidence, these items are considered as indicative references for verification and should be treated as such.7. This Due Diligence Report presents consultant’s assessment of the Project’s compliance against environmental loan covenants and EMP in tabular format.

  • Rejected Load means a Held Load that the SBWMA has either a) inspected in person or by utilizing photographs provided by the Contractor, and agreed that it does not meet the requirements ofExhibit B, Section 5 of this Agreement; or b) waived its right to inspect by not performing such an inspection within 8 Working Hours.

  • Contractor shall inform the SBWMA of the Held Load via e-mail and telephone (number and email to be designated by the SBWMA).

  • An example of a Temporarily Held Load is that of the feeder which serves the Tanana Valley Fair, which is held only for the duration of the event.

  • Held Load means a load of SBWMA C&D Debris delivered to Contractor’s facility, which Contractor believes does not conform to the requirements of Exhibit B, Section 5 of this Agreement, and is being kept separate and undisturbed so that it can be inspected by an authorized representative of the SBWMA.

  • If Contractor declares a load to be held, Contractor shall photograph the Held Load, and shall keep the entire Held Load separate from other materials, and undisturbed, until it can be visually inspected by an authorized representative of the SBWMA.

  • After notification, Contractor must provide the SBWMA up to 8 Working Hours to inspect the Held Load.

  • If the SBWMA finds that the Held Load does conform to the requirements of Section 5, Contractor shall accept the load at the rate for Accepted Loads set forth in Exhibit C Part B.

Related to Held Load

  • Front-end Load means the Sales load which may be included in the offering price of the Units; provided however that different levels of Front-end Load may be applied to different investors, as determined by the Management Company. However aggregate of Front-end Load and Back-end Load should not exceed 3% of Net Asset Value.

  • Back-end Load means the charge deducted from the Net Asset Value in determining the Redemption Price; provided however that different levels of Back-end Load may be applied to different classes of Units, as specified in this document.

  • Available RP Capacity Amount means the amount of Restricted Payments that may be made at the time of determination pursuant to Sections 6.04(a)(ii)(D), (a)(vii) and (a)(x) minus the aggregate amount of the Available RP Capacity Amount utilized by the Borrower or any Restricted Subsidiary to (a) make Investments pursuant to Section 6.06(q)(ii), (b) make Restricted Debt Payments pursuant to Section 6.04(b)(iv)(B) or (c) incur Indebtedness pursuant to Section 6.01(ll).

  • Concentration Reserve Percentage means, at any time of determination, the largest of: (a) the sum of the five (5) largest Obligor Percentages of the Group D Obligors, (b) the sum of the three (3) largest Obligor Percentages of the Group C Obligors, (c) the sum of the two (2) largest Obligor Percentages of the Group B Obligors and (d) the largest Obligor Percentage of the Group A Obligors.

  • Maximum Concentration Level Assessment means the Maximum Concentration Level Assessment for the purposes of a Basic Comprehensive Certificate of Approval, described in the Basic Comprehensive User Guide, prepared by a Toxicologist using currently available toxicological information, that demonstrates that the concentration at any Point of Impingement for a Compound of Concern that does not have a Ministry Point of Impingement Limit is not likely to cause an adverse effect as defined by the EPA. The concentration at Point of Impingement for a Compound of Concern must be calculated in accordance with O. Reg. 419/05.

  • Required Reserve Factor Floor means, for any Calculation Period, the sum (expressed as a percentage) of (a) 12.5% plus (b) the product of the Adjusted Dilution Ratio and the Dilution Horizon Ratio, in each case, as of the most recent Cut-Off Date.

  • Customer Usage Data means the Telecommunications Services usage data of a CLEC End User measured in minutes, sub-minute increments, message units, or otherwise, that is recorded by SBC-13STATE and forwarded to CLEC.

  • credit meter means a meter where an account is issued subsequent to the consumption of electricity;

  • Line Information Data Base (LIDB means a transaction-oriented database system that functions as a centralized repository for data storage and retrieval. LIDB is accessible through CCS networks. LIDB contains records associated with End User line numbers and special billing numbers.

  • LIBOR Rate Reserve Percentage means as of any day the maximum percentage in effect on such day, as prescribed by the Board of Governors of the Federal Reserve System (or any successor) for determining the reserve requirements (including supplemental, marginal and emergency reserve requirements) with respect to eurocurrency funding (currently referred to as “Eurocurrency Liabilities”).

  • House dust mite means mites which feed primarily on skin cells shed in the home by humans and pets and which belong to the phylum Arthropoda, the subphylum Chelicerata, the class Arachnida, the subclass Acari, the order Astigmata, and the family Pyroglyphidae.

  • Available Flowgate Capability or “AFC” shall mean the rating of the applicable Flowgate less the projected loading across the applicable Flowgate less TRM and CBM. The firm AFC is calculated with only the appropriate Firm Transmission Service reservations (or interchange schedules) in the model, including recognition of all roll-over Transmission Service rights. Non- firm AFC is determined with appropriate firm and non-firm reservations (or interchange schedules) modeled.

  • Eurodollar Rate Reserve Percentage for any Interest Period for all Eurodollar Rate Advances comprising part of the same Borrowing means the reserve percentage applicable two Business Days before the first day of such Interest Period under regulations issued from time to time by the Board of Governors of the Federal Reserve System (or any successor) for determining the maximum reserve requirement (including, without limitation, any emergency, supplemental or other marginal reserve requirement) for a member bank of the Federal Reserve System in New York City with respect to liabilities or assets consisting of or including Eurocurrency Liabilities (or with respect to any other category of liabilities that includes deposits by reference to which the interest rate on Eurodollar Rate Advances is determined) having a term equal to such Interest Period.

  • Eurocurrency Rate Reserve Percentage for any Interest Period for all Eurocurrency Rate Advances comprising part of the same Borrowing means the reserve percentage applicable two Business Days before the first day of such Interest Period under regulations issued from time to time by the Board of Governors of the Federal Reserve System (or any successor) for determining the maximum reserve requirement (including, without limitation, any emergency, supplemental or other marginal reserve requirement) for a member bank of the Federal Reserve System in New York City with respect to liabilities or assets consisting of or including Eurocurrency Liabilities (or with respect to any other category of liabilities that includes deposits by reference to which the interest rate on Eurocurrency Rate Advances is determined) having a term equal to such Interest Period.

  • Excess Concentration means the sum of the following amounts, without duplication:

  • Available Transfer Capability or “ATC” shall mean a measure of the transfer capability remaining in the physical transmission network for further commercial activity over and above already committed uses.

  • Excess Concentration Amount means, as of any date of determination on which any one or more of the Concentration Limitations are exceeded, an amount (calculated by the Servicer and without duplication) equal to the Dollar Equivalent of the portion of the Adjusted Principal Balance of each Eligible Collateral Loan that causes such Concentration Limitation to be exceeded.

  • Base Capacity Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Resources and the clearing price for Capacity Performance Resources, representing the cost to procure additional Capacity Performance Resources out of merit order when the Base Capacity Resource Constraint is binding.

  • Customer Deposits means at any time, the aggregate amount at such time of (a) deposits made by customers with respect to the purchase of goods or the performance of services and (b) layaway obligations of the Borrowers.

  • Incremental Available Transfer Capability Revenue Rights means the rights to revenues that are derived from incremental Available Transfer Capability created by the addition of Merchant Transmission Facilities or of one of more Customer-Funded Upgrades.

  • Applicable Registry Operators means, collectively, the registry operators of top-­‐level domains party to a registry agreement that contains a provision similar to this Section 7.6, including Registry Operator.

  • Virtual Collocation shall have the meaning set forth in Sections 8.1.1.1 and 8.2.2.1.

  • Switched Access Detail Usage Data means a category 1101xx record as defined in the EMI iconectiv Practice BR 010-200-010.

  • Eurocurrency Reserve Percentage means, for any day during any Interest Period, the reserve percentage (expressed as a decimal, carried out to five decimal places) in effect on such day, whether or not applicable to any Lender, under regulations issued from time to time by the FRB for determining the maximum reserve requirement (including any emergency, supplemental or other marginal reserve requirement) with respect to Eurocurrency funding (currently referred to as “Eurocurrency liabilities”). The Eurocurrency Rate for each outstanding Eurocurrency Rate Loan shall be adjusted automatically as of the effective date of any change in the Eurocurrency Reserve Percentage.

  • Cost of idle facilities or idle capacity means costs such as maintenance, repair, housing, rent, and other related costs, e.g., insurance, interest, property taxes and depreciation or use allowances.