Examples of Unmetered Load in a sentence
The Unmetered Load Guideline, published separately from Metrology Procedure: Part B is not the subject of consultation under the NER.
If the Retailer is responsible for an ICP that includes Unmetered Load, the Retailer will provide information about the ICP to the Registry in accordance with the Code.
An Unmetered Load Customer shall provide detailed manufacturer information/documentation with regard to electrical demand/consumption of the proposed unmetered load.
Metering Domains are connection points created within the settlement power system model that facilitate the calculation of the Unmetered Load Asset value to ensure that all supply and load are accounted for within the New England Control Area.
The Distributor and the Trader must comply with the provisions of this clause and the policies and procedures set out in Schedule 6 and the relevant provisions of the Code in respect of carrying out: new connections to the Network; capacity changes to existing connections; Temporary Disconnections and associated reconnections; Vacant Site Disconnections and associated reconnections; Decommissioning; and connections that incorporate Unmetered Load.
This Unmetered Load Guideline (Guideline) assists persons who wish to apply to have a type 7 Unmetered Device included in the Load Table and outlines the process by which AEMO will consider an application to update the Load Table, as contemplated by section 13.1.5(d) of Metrology Procedure: Part B.This Guideline supplements Metrology Procedure: Part B.
Metering Domains are connection points created within the Settlement Power System Model that facilitate the calculation of the Unmetered Load Asset value to ensure that all generation and load is accounted for within the New England Control Area.
Instructional Day begins8:15 AMInstructional Day ends2:45 PMStudents dismissed2:45 – 3:00 PMBuilding Secured (closed)3:30 PM Our school hours are 8:15 AM – 2:45 PM.
This Unmetered Load Guideline (Guideline) assists persons who wish to apply to have an type 7 Unmetered Device included in the Load Table and outlines the process by which AEMO will consider an application to update the Load Table, as contemplated by section 132.1.4(d) of Metrology Procedure: Part B.This Guideline supplements Metrology Procedure: Part B.
The Distributor’s Charges will be calculated by the Retailer using the appropriate Price Category and any relevant quantity (such as capacity) as advised by the Distributor in respect of the periods in which such Price Category applies and, unless the ICP is an ICP across which Unmetered Load is shared or the Consumer is otherwise paying a fully fixed line charge, the relevant meter reading data in the possession of the Retailer or, if no such meter reading data is available, using an Assessment Method.