Hot Mix Asphalt definition
Examples of Hot Mix Asphalt in a sentence
The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the Texas Asphalt Pavement Association (TXAPA) for Hot Mix Asphalt, ACI for concrete, and the Soils and Base Certification Program, as listed below.
Delete the first paragraph and Substitute the following: “For each bituminous mixture required by the plans or the proposal, the Contractor shall formulate and submit to the Engineer, a SUPERPAVE Mix Design and a Job Mix Formula (JMF) that satisfies the requirements of this section and the mixture design criteria as written in Materials Method 5.16, Superpave Hot Mix Asphalt Mixture Design and Mixture Verification Procedures.
The Contractor is responsible for procuring the samples of materials, and performing the required SUPERPAVE mix design tests in accordance with NYSDOT Materials Method 5.16, SUPERPAVE Hot Mix Asphalt Mixture Design and Mixture Verification Procedures.
Add the following to the second paragraph: “Crushed gravels utilized for coarse aggregate in the production of any Hot Mix Asphalt Mixture to be placed on traffic lanes and ramps on the Mainline Thruway and Spurs shall be processed so that 90% of all particles larger than 4.75 mm have a minimum of two (2) fractured faces and 95% shall have a minimum of one (1) fractured face.
The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the Texas Asphalt Pavement Association (TxAPA) for Hot Mix Asphalt, and the Soils and Base Certification Program, as listed below.
The Engineer shall provide certified technicians to perform the following tests: • Hot Mix Asphalt Testing, HMAC o ▇▇▇▇▇ ▇▇ o Level 1B o Level 2 o All other tests in the Manual of Testing Procedures 200-F Series or ASTM Procedures not covered in ▇▇▇▇▇ ▇▇, ▇▇▇▇▇ ▇▇, or Level 2 will be administered by the state central lab per the QAP.
All holes 12” in diameter or less must be immediately backfilled with CR6 Crusher Run and 6” of Perma-Patch, Hot Mix Asphalt, or approved equal.
The minimum acceptable depths of granular and asphalt will be as follows: Granular “A” – 150mm (minimum) Surface Hot Mix Asphalt, H.L.-3 or H.L.-3A – 50mm compacted depth (minimum).
Hot Mix Asphalt Pavement: 50 mm compacted depth of hot-mix, hot laid base course asphalt, HL-8 course mix and 40 mm compacted depth of hot-mix, hot laid base course asphalt, HL-4.
If a Hot Mix Asphalt Item has a payment unit other than ton, the Department will apply an appropriate conversion factor to determine the number of tons of asphalt binder used.