Industrial Stormwater Permit definition

Industrial Stormwater Permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries that regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.
Industrial Stormwater Permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies. “Infiltration” means the process of percolating stormwater runoff into the subsoil. “Jurisdictional Wetland" means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation
Industrial Stormwater Permit means a National Pollutant Discharge

Examples of Industrial Stormwater Permit in a sentence

  • Where industrial facilities are not authorized to infiltrate industrial stormwater under an NPDES/SDS Industrial Stormwater Permit issued by the MPCA.

  • Any parcel that has an active and valid NPDES Industrial Stormwater Permit.

  • The management of water quality through obtaining a General Industrial Stormwater Permit and implementing BMPs is intended to ensure that water quality does not degrade to levels that would violate water quality standards.

  • Industrial Stormwater Permit - a State Pollutant Discharge Elimination System permit issued to a commercial industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.

  • When excavation occurs in areas covered by a Construction or Industrial Stormwater Permit, CONTRACTOR shall comply with the existing site Stormwater Pollution Prevention Plan (SWPPP).

  • This pandemic may result in substantial market volatility and may adversely impact the prices and liquidity of a fund’s investments.

  • The co-permittees may use the actions required in the NPDES Industrial Stormwater Permit to address the applicable facility requirements in Schedule A.3.f.viii.

  • Co-permittee-owned NPDES Industrial Stormwater Permit Facilities Co-permittee-owned or operated facilities with industrial activity as defined in 40 CFR §122.26(b)(14) discharging stormwater to the waters of the state must continue to maintain coverage under DEQ’s NPDES Industrial Stormwater General Permit.

  • The permit registrant may use the actions required in the NPDES Industrial Stormwater Permit to address the applicable facility requirements in Schedule A.3.f.vi.

  • Where industrial facilities are not authorized to infiltrate industrial stormwater under an NPDES/SDS Industrial Stormwater Permit issued by the Agency.


More Definitions of Industrial Stormwater Permit

Industrial Stormwater Permit means all industrial stormwater permits issued under the Clean Water Act for industrial activities conducted within the City, including the State General Industrial Stormwater Permit.
Industrial Stormwater Permit means a National Pollutant Discharge Elimination System permit issued to a commercial industry or group of industries that regulates the pollutant levels ass ciated with industrial stormwater discharges or specifies on-site pollution control st ategies.
Industrial Stormwater Permit means an National Pollutant Discharge Elimination System permit issued to a commercial industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies. “Infiltration” means the process of percolating stormwater into the subsoil.
Industrial Stormwater Permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the

Related to Industrial Stormwater Permit

  • Industrial wastewater means the water or liquid carried waste from an industrial process. These wastes may result from any process or activity of industry, manufacture, trade or business, from the development of any natural resource, or from animal operations such as feedlots, poultry houses, or dairies. The term includes contaminated storm water and leachate from solid waste facilities.

  • Operating Permit means a permit issued pursuant to section 10 of this local law. The term “Operating Permit” shall also include an Operating Permit which is renewed, amended or extended pursuant to any provision of this local law.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Wastewater means the spent water of a community. From the standpoint of source, it may be a combination of the liquid and water-carried wastes from residences, commercial buildings, industrial plants, and institutions, together with any groundwater, surface water, and storm water that may be present.

  • Stormwater means water resulting from precipitation (including rain and snow) that runs off the land’s surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.

  • Building Permit means a permit for the construction of one or more Units, issued by the City, or other public agency in the event the City no longer issues said permits for the construction of Units within CFD No. 11. For purposes of this definition, "Building Permits" shall not include permits for construction or installation of commercial/industrial structures, parking structures, retaining walls, and utility improvements not intended for human habitation.

  • Wastewater facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.