Interconnector Availability definition

Interconnector Availability means the availability of Interconnector Capacity over thelicensee’s Interconnector.
Interconnector Availability means the availability of Interconnector Capacity over the

Examples of Interconnector Availability in a sentence

  • The value of the AICt term is determined in accordance with Part B of special condition 4 (Interconnector Availability Incentive) of this licence and shall have a value between 0.98 and 1.02.

  • Subject to Part F (Adjustments to account for partial years) of this condition, the Availability Target for the licensee’s Interconnector is to achieve 8,507,403 megawatt hours (MWh) of Interconnector Availability in any Relevant Year.

  • Subject to Part F (Adjustments to account for Partial Years) of this condition, the Availability Target for the licensee’s Interconnector is to achieve 8,467,079 megawatt hours (MWh) of Interconnector Availability in any Relevant Year.

  • The Availability Target (%) for the Licensee’s Interconnector is as specified in the FPA Decision to achieve a specific megawatt hours (MWh) of Interconnector Availability in any Relevant Year.

  • Subject to Part F (Adjustments to account for partial years) of this condition, the Availability Target for the licensee’s Interconnector is to achieve 8,507,403 MWh of Interconnector Availability in any Relevant Year.

  • These incentives are discussed further in Chapter 3 under Special Condition 4 (Interconnector Availability Incentives).

  • The value of the AICt term is determined in accordance with paragraph 11 of special condition 4 (Interconnector Availability Incentive) of this licence and shall have a value between 0.98 and 1.02.

  • In general there is good agreement between depths from survey H11857 and the charts.

  • Subject to Part F (Adjustments to account for Partial Years) of this condition, the Availability Target for the licensee’s Interconnector is to achieve 11,413,332 megawatt hours (MWh) of Interconnector Availability in any Relevant Year.

  • Figure 10.2: Historic Moyle Interconnector Availability 2002/03 – 2013 The considerable reduction of availability in 2013 on the Moyle Interconnector was mainly caused by the ongoing problems with cable faults.10.2.1. Moyle Interconnector Historic UnavailabilityThe 2013 Annual Unavailability of the Moyle Interconnector was 56.50%.

Related to Interconnector Availability

  • Interconnector means equipment used to link the electricity system of the State to electricity systems outside of the State;

  • Interconnect means to connect an alarm system including an automatic dialing device to a telephone line, either directly or through a mechanical device that utilizes a telephone, for the purpose of using the telephone line to transmit a message upon the activation of the alarm system.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Interconnection Service means the physical and electrical interconnection of the Customer Facility with the Transmission System pursuant to the terms of Tariff, Part IV and Tariff, Part VI and the Interconnection Service Agreement entered into pursuant thereto by Interconnection Customer, the Interconnected Transmission Owner and Transmission Provider. Interconnection Service Agreement:

  • Electric generation service means the provision of retail

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • Electrical Distance means, for a Generation Capacity Resource geographically located outside the metered boundaries of the PJM Region, the measure of distance, based on impedance and in accordance with the PJM Manuals, from the Generation Capacity Resource to the PJM Region.

  • Generation Service means the sale of electricity, including ancillary services such as the provision of reserves, to a Customer by a Competitive Supplier.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Interconnection is As Defined in the Act.

  • Interconnection Service(s means any Interconnection, Resale Services, 251(c)(3) UNEs, Collocation, functions, facilities, products or services offered under this Agreement.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Train Loading Infrastructure means conveyors, stockpile areas, blending and screening facilities, stackers, re‑claimers and other infrastructure reasonably required for the loading of iron ore, freight goods or other products onto the relevant Railway for transport (directly or indirectly) to a loading port; and

  • Surplus Interconnection Service means any unneeded portion of Interconnection Service established in an Interconnection Service Agreement, such that if Surplus Interconnection Service is utilized, the total amount of Interconnection Service at the Point of Interconnection would remain the same. Switching and Tagging Rules:

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this article, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • interconnected system means a number of transmission and distribution systems linked together by means of one or more interconnectors;

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • high voltage means the classification of an electric component or circuit, if its working voltage is > 60 V and ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms).

  • Signaling System 7 (SS7) means a signaling protocol used by the CCS Network.

  • Demarcation Point means the point where Qwest owned or controlled facilities cease, and CLEC, End User Customer, premises owner or landlord ownership or control of facilities begin. "Designed, Verified and Assigned Date" or "DVA" means the date on which implementation groups are to report that all documents and materials have been received and are complete.

  • Signaling System 7 (SS7 means a signaling protocol used by the CCS Network.

  • Synchronous Optical Network (SONET) is an optical interface standard that allows inter-networking of transmission products from multiple vendors. The base rate is 51.84 Mbps (“OC-1/STS-1”) and higher rates are direct multiples of the base rate, up to 13.22 Gbps.