Klamath Project Water Users definition

Klamath Project Water Users shall have the meaning assigned to those terms on the 2016 Power and Facilities Agreement.
Klamath Project Water Users means Tulelake Irrigation District,

Examples of Klamath Project Water Users in a sentence

  • The terms in paragraphs 1 through 3 shall remain in effect until modified by agreement of the Secretary of the Interior and Klamath Project Water Users.

  • The U.S. Fish and Wildlife Service (FWS) and Klamath Project Water Users are working on interim actions under KBRA Section 15.1.2.J to resolve outstanding issues related to water rights for the Refuges.

  • The U.S. Fish and Wildlife Service (FWS) and Klamath Project Water Users have agreed to work on interim actions under KBRA Section 15.1.2.J to resolve outstanding issues related to water rights for the Refuges.

  • The composition, activities and rules of operation of these Committees are explained in detail below.

  • The lake level right has a priority date of time immemorial, but pursuant to an agreement between the Klamath Project Water Users, the Klamath Tribes, the United States Bureau of Indian Affairs, and the Department, this right is subordinated to August 9, 1908.15 KA 1000 erroneously refers to KA 293, but this is a typographical error.

Related to Klamath Project Water Users

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Transportation project or "project" means any or the

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Water user means a person, corporation, or other entity having a right to divert water from the Bear River for beneficial use;

  • Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project site, where applicable, means the place indicated in bidding documents.

  • The Works/Project means the works to be executed or done under this contract.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Wastewater System means a system of wastewater collection, treatment,

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

  • Potable water means water which meets the requirements of 35 Ill. Adm. Code 604 for drinking, culinary, and domestic purposes.

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.

  • licensed water supplier means a company which is the holder for the time being of a water supply licence under Section 17A(1) of the 1991 Act(f);

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.

  • Tourism destination project means a qualified non-gaming business facility that will be among the most visited privately owned or operated tourism or recreation sites in the State, and which is located within the qualified incentive area and has been determined by the authority to be in an area appropriate for development and in need of economic development incentive assistance, including a non-gaming business within an established Tourism District with a significant impact on the economic viability of that District.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Project Companies means all Group Project Companies and Non-Group Project Companies together, each being a “Project Company”.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.