illegal connection means a connection to any system through which a municipal service is provided and that is not authorized or approved by the Municipality;
Legal Costs of a person means legal costs incurred by that person in defending an action for a Liability of that person.
Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.
General Provisions means those portions of the Subscription Agreement headed “General Provisions” and contained on pages 7 to 12;
CPUC Decisions means CPUC Decisions 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000, 00-00-000 and any other existing or subsequent decisions, resolutions or rulings related to resource adequacy, as may be amended from time to time by the CPUC.
body governed by public law means any body:
Academic and professional matters means the following policy development and implementation matters:
Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.
bodies governed by public law means bodies that have all of the following characteristics:
Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.
Total confinement means confinement inside the physical
the decisions means the decisions of the CMA on the questions which it is required to answer by virtue of section 35 of the Act;
Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Interpretation means an addendum to a Reliability Standard, developed in accordance with the NERC Standard Processes Manual and approved by the Applicable Governmental Authority(ies), that provides additional clarity about one or more Requirements in the Reliability Standard.
fruitless and wasteful expenditure means expenditure that was made in vain and would have been avoided had reasonable care been exercised;
Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.
Foreign construction material means a construction material other than a domestic construction material.
Schematic Design Documents means drawings prepared by the Trade Contractor that illustrate the scale and relationship of the various Trade Contractor Work components and which also contain square footage and volume calculations for the building interior spaces, building exterior spaces, and major architectural and interior finishes.
Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.
Surviving Provisions has the meaning specified in Section 10.02.
Company By-laws means the by-laws of the Company, as amended to the date of this Agreement.
Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.
Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.
Trade name means the name of the Hotel set forth in the Addendum.
Final Approval Order and Judgment means the order in which the Court certifies the Settlement Class, grants final approval of this Settlement Agreement, authorizes the entry of a final judgment, and dismisses the Action with prejudice.
Expert advice or assistance means advice or assistance derived from scientific, technical, or other specialized knowledge.