Service Activation Date means the same as Activation Date.
Activation Date means the date upon which MLBFS shall cause the WCMA Line of Credit to be fully activated under MLPF&S' computer system as part of the WCMA Program.
Deactivation Date means the date a generating unit within the PJM Region is either retired or mothballed and ceases to operate. Decrement Bid:
Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.
License Effective Date means, with respect to each Component System of the Licensed System that Company is given the right to access and use, the date as of which the Company is first given such right to access and use.
Best available control technology (BACT means an emissions limitation (including a visible emission standard) based on the maximum degree of reduction for each pollutant subject to regulation under CAA which would be emitted from any proposed major stationary source or major modification which the Department, on a case-by-case basis, takes into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 7 DE Admin. Code 1120 and 1121. If the Department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results.
Scheduled Commercial Operation Date shall have the meaning ascribed to it in Clause 5.4.1;
License Period means the period beginning from the Commencement Date and ending on the Termination Date.
Milestone Date means the date set against the relevant Milestone in the Implementation Plan;
Service Drop means the overhead service conductors from the service point to the connection to the service-entrance conductors at the building or other structure.
Gross beta particle activity means the total radioactivity due to beta particle emission as inferred from measurements on a dry sample.
License Term means in respect of each Site, the period for its license to be used by the Access Seeker commencing on the Commencement Date and as stipulated in the respective SLO.
Implementation Period means the period from the date of signing of the Agreement and up to the issuance of Final Acceptance Certificate for the project.
Programme Date means the date of this Base Prospectus.
Excluded Downtime has the meaning set forth in Section 2 below.
Programme Effective Date means 5 December 2017.
Implementation Date means the date, occurring after the Approval Date, on which the Merger is implemented by the Merging Parties;
Best available control technology or “BACT” means an emissions limitation, including a visible emissions standard, based on the maximum degree of reduction for each regulated NSR pollutant which would be emitted from any proposed major stationary source or major modification which the reviewing authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combination techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 567—subrules 23.1(2) through 23.1(5) (standards for new stationary sources, federal standards for hazardous air pollutants, and federal emissions guidelines), or federal regulations as set forth in 40 CFR Parts 60, 61 and 63 but not yet adopted by the state. If the department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard or combination thereof may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation and shall provide for compliance by means which achieve equivalent results.
Milestone Payment Date has the meaning set forth in Section 2.4(a).
Service Termination Date means the last Day in a month upon which Service shall terminate, as set forth in a Schedule of Service and subject to any renewal thereof.
Transition Date means the date on which this contract comes into effect for all purposes. Schedule 1 (Contract Particulars)
Agreement Termination Date is defined in Section 7.4.
Ramp-Up Period means the period from and including the Effective Date to, but excluding, September 23, 2016.
transitional period means the period of time beginning on the
Initial Termination Date has the meaning set forth in Section 8.2(a).
Continuous Improvement Plan means a plan for improving the provision of the Goods and/or Services and/or reducing the Charges produced by the Supplier pursuant to Framework Schedule 12 (Continuous Improvement and Benchmarking);