Minister for Lands and Surveys definition

Minister for Lands and Surveys means the Minister of the Crown to whom the administration of the Land Xxx 0000 8 is for the time being committed by the Governor 7;

Examples of Minister for Lands and Surveys in a sentence

  • Government Xxx 0000; the Minister for Lands and Surveys means the Minister of the Crown to whom the administration of the Land Xxx 0000 8 is for the time being committed by the Governor 7; the Surveyor General means the person for the time being holding or acting in the office of Surveyor General under section 173 of the Land Xxx 0000 8.

  • THE COMMON SEAL of the MINISTER FOR LANDS AND SURVEYS was hereunto affixed by the HONOURABLE the Minister for Lands and Surveys for the time being in the presence of: THE COMMON SEAL of SECRET HARBOUR PTY.

  • THE COMMON SEAL of the MINISTER FOR LANDS AND SURVEYS was hereunto affixed by the HONOURABLE the Minister for Lands and Surveys for the time being in the presence of: ...............................................................

  • Government Act 1995; the Minister for Lands and Surveys means the Minister of the Crown to whom the administration of the Land Act 1933 8 is for the time being committed by the Governor 7; the Surveyor General means the person for the time being holding or acting in the office of Surveyor General under section 173 of the Land Act 1933 8.

  • It is provided under section 5 that the Minister for Lands and Surveys shall give notice to the persons interested or claiming to be interested in such lands or to the persons entitled by this Ordinance to sell or convey the same.

Related to Minister for Lands and Surveys

  • Land surveyor means a person who by reason of knowledge of

  • Record of survey map means a map of a survey of land prepared in accordance with Section 10-9a-603, 17-23-17, 17-27a-603, or 57-8-13.

  • Title Report has the meaning set forth in Section 5.4(b).

  • Professional land surveyor means a professional land surveyor licensed under ch. 443.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • Improvement completion assurance means a surety bond, letter of credit,

  • Survey Area means the area of land or waters the subject of a Survey, or proposed to be the subject of a Survey.

  • Existing Survey means the existing ALTA survey of the Property.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Development regulations or "regulation" means the controls

  • Seismic impact zone means an area with a 10% or greater probability that the maximum horizontal acceleration in lithified earth material, expressed as a percentage of the earth's gravitational pull (g), will exceed 0.10g in 250 years.

  • Central KYC Records Registry (CKYCR) means an entity defined under Rule 2(1) of the Rules, to receive, store, safeguard and retrieve the KYC records in digital form of a customer.

  • Data Protection Impact Assessment means an assessment by the Controller of the impact of the envisaged processing on the protection of Personal Data.

  • Surveys has the meaning set forth in Section 4(o) above.

  • Survey shall have the meaning set forth in Section 4.1.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;

  • Zoning map means a map, adopted as part of a land use ordinance, that

  • Unfit-for-use tank system means a tank system that has been determined through an integrity assessment or other inspection to be no longer capable of storing or treating hazardous waste without posing a threat of release of hazardous waste to the environment.

  • Transboundary movement means any movement of hazardous wastes or other wastes from an area under the national jurisdiction of one State to or through an area under the national jurisdiction of another State or to or through an area not under the national jurisdiction of any State, provided at least two States are involved in the movement;

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • U.S. Special Resolution Regimes has the meaning specified in Section 11.21.

  • Owner or operator means any person who owns, leases, operates, controls, or supervises a stationary source.