Minor Buffer Management Plan definition

Minor Buffer Management Plan means a type of Buffer Management Plan and all supporting documentation required under Chapter of this Ordinance.
Minor Buffer Management Plan means a type of Buffer Management Plan and all supporting documentation required under COMAR 27.01.09.01-3I

Related to Minor Buffer Management Plan

  • Project Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.2 of Exhibit B to the ITP.

  • Asset Management Plan means a strategic document that states how a group of assets are to be managed over a period of time. The plan describes the characteristics and condition of infrastructure assets, the levels of service expected from them, planned actions to ensure the assets are providing the expected level of service, and financing strategies to implement the planned actions. The plan may use any appropriate format, as long as it includes the information and analysis required to be in a plan as described in Ontario’s Building Together: Guide for Asset Management Plans.

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Quality Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.3 of Exhibit B to the ITP.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Forest management plan means a written plan prepared and signed by a qualified forester that prescribes measures to optimize production, utilization, regeneration, and harvest of timber. The forest management plan shall include a schedule and timetables for the various silvicultural practices used on forestlands, which shall be a maximum of 20 years in length. A forest management plan shall include all of the following:

  • Drug therapy management means the review of a drug therapy regimen of a patient by one or more pharmacists for the purpose of evaluating and rendering advice to one or more practitioners regarding adjustment of the regimen.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Project Management Unit and “PMU” each means the Recipient’s unit responsible for the implementation of its Respective Part of the Project referred to in Section I.A.2 of Schedule 2 to this Agreement.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Program Parameter means, in respect of a program, the provincial standards (such as operational, financial or service standards and policies, operating manuals and program eligibility), directives, guidelines and expectations and requirements for that program;

  • Collaborative drug therapy management means participation by an authorized pharmacist and a physician in the management of drug therapy pursuant to a written community practice protocol or a written hospital practice protocol.

  • Stinger-steered automobile or watercraft transporter means an automobile or watercraft transporter

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Change Management means the add-on module to the Programs that enables engineers to define network changes through one or more configuration templates. Those network changes can be applied to multiple devices and executed/rolled back automatically. The Change Management module enables engineers to verify the impact of the changes across the network to help ensure a safer change process.

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.