Digital Signal Level 0 (DS-0 means the lowest-level signal in the time division multiplex digital hierarchy, and represents a voice-grade channel operating at either the 56 Kbps or 64 Kbps transmission bit rates. There are twenty-four (24) DS-0 channels in a DS-1.
Model 2 seller means a seller registered under the agreement that:
System Impact Study means an assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights. System Protection Facilities: “System Protection Facilities” shall refer to the equipment required to protect (i) the Transmission System, other delivery systems and/or other generating systems connected to the Transmission System from faults or other electrical disturbance occurring at or on the Customer Facility, and (ii) the Customer Facility from faults or other electrical system disturbance occurring on the Transmission System or on other delivery systems and/or other generating systems to which the Transmission System is directly or indirectly connected. System Protection Facilities shall include such protective and regulating devices as are identified in the Applicable Technical Requirements and Standards or that are required by Applicable Laws and Regulations or other Applicable Standards, or as are otherwise necessary to protect personnel and equipment and to minimize deleterious effects to the Transmission System arising from the Customer Facility. Transmission Facilities:
Digital Signal Level 1 (DS-1 means the 1.544 Mbps first level signal in the time division multiplex hierarchy.
Stage 1 means the area at Port Xxxxxxx which is the subject of this Agreement and of the ERMP and which is shown bordered in purple as “stage 1” on Department of Land Administration 4 Miscellaneous Plan No. 1743;
Digital Signal Level 3 (DS-3 means the 44.736 Mbps third level signal in the time division multiplex hierarchy.
Process weight means the total weight of all materials introduced into any source operation. Solid fuels charged will be considered as part of the process weight, but liquid and gaseous fuels and combustion air will not.
Snow tyre means a tyre whose tread pattern, tread compound or structure is primarily designed to achieve in snow conditions a performance better than that of a normal tyre with regard to its ability to initiate or maintain vehicle motion."
Hot Weather Alert means the notice provided by PJM to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for extreme hot and/or humid weather conditions which may cause capacity requirements and/or unit unavailability to be substantially higher than forecast are expected to persist for an extended period. IDR Transfer Agreement:
Baseline means the “Initial Small Business Lending Baseline” set forth on the Initial Supplemental Report (as defined in the Definitive Agreement), subject to adjustment pursuant to Section 3(a).
Digital Signal Level 0 or "DS0" means the 64 Kbps zero-level signal in the time-division multiplex hierarchy.
Level 2 Support means, with the use of technical support specialists: (i) performing Defect isolation, Defect replication and interoperability testing; (ii) performing remote diagnostic services and on-site troubleshooting, if required; (iii) identifying the source of Defects; (iv) developing a reproducible test case for any Defect and documenting the details of such Defect for escalation to Level 3 Support; and (v) developing and implementing Workarounds where reasonably possible.
Phase 2 means the second implementation phase of this section, beginning June 1, 2022 and continuing thereafter.
Cannabis testing facility means an entity registered by
Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.
Embryo/fetus means the developing human organism from conception until the time of birth.
Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.
Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.
Cold Weather Alert means the notice that PJM provides to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for expected extreme cold weather conditions.
Broadband level means all positions sufficiently similar in knowledge, skills, and abilities, and sufficiently similar as to kind or subject matter of work, level of difficulty or responsibilities, and qualification requirements of the work, to warrant the same treatment as to title, pay band, and other personnel transactions.
Embryo/fetus means the developing human organism from conception until the time of birth.
Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.
Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per
CAISO Grid means the system of transmission lines and associated facilities of the Participating Transmission Owners that have been placed under the CAISO’s operational control.
Impact surface means an interior or exterior surface that is subject to damage by repeated sudden force such as certain parts of door frames.
Phase 2 Clinical Trial means a human clinical trial of a product in any country that would satisfy the requirements of 21 C.F.R. 312.21(b) and is intended to explore a variety of doses, dose response, and duration of effect, and to generate initial evidence of clinical safety and activity in a target patient population, or a similar clinical study prescribed by the relevant Regulatory Authorities in a country other than the United States.