Operation Period means the period commencing from COD and ending on the Transfer Date;
Operating Period for any Element of the Project shall mean the period from (and including) the COD of such Element of the Project, up to (and including) the Expiry Date and for the Project, shall mean the period from (and including) the COD of the Project, up to (and including) the Expiry Date;
Production Period is the period that for winter cereal advances commences October 1, 2021 and terminates September 30, 2023; for advances on all other field crops, honey, hogs, goats, sheep and lambs commences April 1, 2022 and terminates September 30, 2023; and for advances on cattle, continuous flow cattle, and bison commences on April 1, 2022 and terminates on March 31, 2024.
Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.
Animal feeding operation (“AFO”) means a lot or facility (other than an aquatic animal production facility) where animals have been, are, or will be stabled or confined and fed or maintained for a total of 45 days or more in any 12-month period, and crops, vegetation, forage growth, or post-harvest residues are not sustained in the normal growing season over any portion of the lot or facility [40 CFR § 122.23(b)(1)].
Operational Period means the Certificate’s actual term of validity, beginning with the start of the Validity Period and ending on the earlier of: (i) the end of the Validity Period disclosed in the Certificate; or (ii) the revocation of the Certificate.
Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.
Duration means the warranty period. This period may be a stated period of time, amount of usage, or the occurrence of a specified event, after formal acceptance of delivery, for the Government to assert a contractual right for the correction of defects.
Completion Period means the period starting from the date of issue of "Order" and required to complete the work in all respect.
Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;
Scheduled Commercial Operation Date shall have the meaning ascribed to it in Clause 5.4.1;
Monitoring Period means the period from the Launch Date to the Valuation Date (both dates including) at such point in time at which the Reference Price of the Underlying is determined and published..
Maintenance Period shall have the meaning set forth in Clause 14.1; “Maintenance Requirements” shall have the meaning set forth in Clause 14.2;
Commissioning Period has the meaning set forth in Attachment T.
Period shall have the meaning ascribed to it in Schedule 8;
Monitoring well means a water well intended for the purpose of determining groundwater quality or quantity.
Guaranteed Commercial Operation Date has the meaning set forth in Section 3.9(c)(i).
Implementation Period means the period from the date of signing of the Agreement and up to the issuance of Final Acceptance Certificate for the project.
Initial Operation means the first integral operation of the complete equipment covered under the Contract with the sub-system and supporting equipment in service or available for service.
Development Period means the period from the date of this Agreement until the Appointed Date;
Continuous monitoring system means the total equipment, required under the emission monitoring section in applicable subsections used to sample and condition (if applicable), to analyze, and to provide a permanent record of emissions or process parameters.
Program Period means the period of time which the department intends to support the program without requiring the recompetition for funds. The program period is specified within the grant application.
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Working Week means an average of 48 hours each week calculated over a 17-week reference period.
Services Commencement Date means the date delivery of the Services shall commence as specified in the Key Provisions. If no date is specified in the Key Provisions this date shall be the Commencement Date;
Model Year means the CI engine manufacturer’s annual production period, which includes January 1st of a calendar year, or if the manufacturer has no annual production period, the calendar year.