Examples of Outer Harbour in a sentence
That this House condemns the McGowan Government for its ill-conceived Outer Harbour proposal that cannot be justified on economic, social or environmental grounds.
The connecting line of buoys 35/32/MG 2 to Hoek van Baarland along the river banks, Hansweert Outer Harbour included, as far as connecting line of buoys SvV4/SvV3, to the connecting line of buoys 46/55, along this line to the coast, along the river banks to buoys 35.
These roads were Martinique Way, Grenada Close, St Kitt’s Drive, Leeward Quay, Santa Cruz Drive (part), Jamaica Way (part), Windward Quay (part) and the Outer Harbour Walkway.
The connecting line between buoys 15A/E2A via coastline to Hoek van Baarland, buoys MG2/32/35 via coastline, Terneuzen Outer Harbour included as far as connecting line between buoys 15A/E2A.
Outer Harbour – The majority of the Outer Harbour consists of sloping battered masonry walls, which are believed to cover the original unstable vertical walls.
We do not recommend infilling the East Dock with dredged material as we believe that this is an asset that can be used for future expansion of the Outer Harbour and allow creation of a fixed water body that will be vital in the redevelopment of the waterside.
Estimated budget costs have been provided for the high, medium and low priority repairs that require repair in the next 1 to 2 years, 2 to 5 years and 5 to 10 years for the Outer Harbour, West Dock and East Dock.Costs have also been provided for the investigations required and inspection cost required on an annual basis.
We do not recommend infilling the West Dock with dredged material as we believe that this is an asset that can be used for future expansion of the Outer Harbour.
Rowley Road is an important part of the regional road network and is planned to provide an important link for land side infrastructure associated with development of the Fremantle Outer Harbour and James Point ports in Cockburn Sound.
The main components of Stage 2 works are: • Excavation of the remainder of the Boatharbour which was not excavated in Stage 1• Surcharging (and removal) of the P2B Surcharge Area and any incomplete portions of the P3 Surcharge Area• Removal of the surcharge material from Surcharge P1A, P1B and P2A• Construct edge treatment for the Boatharbour• Install boardwalk piles• Construct boat ramp in the Outer Harbour 1.2. IntroductionThis document provides a summary of monthly environmental performance on site.