Examples of Percolation rate in a sentence
Percolation rate measurements should be made on the day following the saturation process, except in sandy soils.
Percolation rate shall be a minimum of the depth of the tree pit or bioswale within 24 hours.
Detailed study report considering Percolation rate of the land available for gardening & plantation.
Percolation rate measurements shall be made after 15 hours and no more than 30 hours after the soaking period begins.
The trench bottom area required in square feet per 100 gallons (Ft²/100 Gals) of sewage applied for various soil percolation rates is tabulated in Table 5.4. The area requirements are based on the equation: log y = 2.00 + 0.008 (x) where y = Ft²/100 Gals x = Percolation rate in minutes/inch Notwithstanding the above, the minimum absorption area for single family residential dwellings shall be 400 square feet.