Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Development Site means any parcel or lot on which exists or which is intended for building development other than the following:
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.
Bulk gasoline terminal means a gasoline storage facility which receives gasoline from its supply source primarily by pipeline, ship, or barge, and delivers gasoline to bulk gasoline plants or to commercial or retail accounts primarily by tank truck; and has an average daily throughput of more than 76,000 liters (20,000 gallons) of gasoline.
Commissioning Period has the meaning set forth in Attachment T.
Project Start Date means the first Milestone Start Date specified in Schedule B;
Phase 1 Study means a clinical study of a drug candidate in human patients with the primary objective of characterizing its safety, tolerability, and pharmacokinetics and identifying a recommended dose and regimen for future studies as described in 21 C.F.R. §312.21(a), or a comparable clinical study prescribed by the relevant Regulatory Authority in a country other than the United States. The drug candidate can be administered to patients as a single agent or in combination with other investigational or marketed agents.
Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.
Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).
Pump spray means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger or other actuator.
Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.
Development Activity means any activity defined as Development which will necessitate a Floodplain Development Permit. This includes buildings, structures, and non-structural items, including (but not limited to) fill, bulkheads, piers, pools, docks, landings, ramps, and erosion control/stabilization measures.
Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.
Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).
System Impact Study means an assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights. “System Protection Facilities” shall refer to the equipment required to protect (i) the Transmission System, other delivery systems and/or other generating systems connected to the Transmission System from faults or other electrical disturbance occurring at or on the Customer Facility, and (ii) the Customer Facility from faults or other electrical system disturbance occurring on the Transmission System or on other delivery systems and/or other generating systems to which the Transmission System is directly or indirectly connected. System Protection Facilities shall include such protective and regulating devices as are identified in the Applicable Technical Requirements and Standards or that are required by Applicable Laws and Regulations or other Applicable Standards, or as are otherwise necessary to protect personnel and equipment and to minimize deleterious effects to the Transmission System arising from the Customer Facility.
Continuous Improvement Plan means a plan for improving the provision of the Goods and/or Services and/or reducing the Charges produced by the Supplier pursuant to Framework Schedule 12 (Continuous Improvement and Benchmarking);
Phase I Clinical Study means a human clinical study of a product, the principal purpose of which is a preliminary determination of safety in healthy individuals or patients, as described in 21 C.F.R. 312.21(a).
Project Completion Date means the date on which the Completion Certificate is issued;
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Completion Period means the period starting from the date of issue of "Order" and required to complete the work in all respect.
Phase 2 Clinical Trial means a human clinical trial, for which the primary endpoints include a determination of dose ranges or an indication of efficacy in patients being studied as described in 21 C.F.R. §312.21(b), or an equivalent clinical trial in a country in the Territory other than the United States.
Phase I Trial means a Clinical Trial, the principal purpose of which is preliminary determination of safety of an investigational product in healthy individuals or patients or that otherwise meets the requirements described in 21 C.F.R. §312.21(a), or similar Clinical Trial in a country other than the United States.
Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.
Phase 1 Clinical Trial means a Clinical Trial of a Product on sufficient numbers of normal volunteers and/or patients that is designed to establish that such Product is safe for its intended use and to support its continued testing in Phase 2 Clinical Trials. For purposes of this Agreement, ‘initiation’ of a Phase 1 Clinical Trial for a Product means the first dosing of such Product in a human subject in a Phase 1 Clinical Trial.