Phasing of construction definition

Phasing of construction means sequential development of smaller portions of a large project site, stabilizing each portion before beginning land disturbance on subsequent portions, to minimize exposure of disturbed land to erosion.
Phasing of construction means sequential development of smaller portions of a large project site, stabilizing each portion before initiating land disturbing activities on the next portion, to minimize exposure of land to erosion.
Phasing of construction means sequential development of smaller portions of a large project site, stabilizing each portion

Examples of Phasing of construction in a sentence

  • Phasing of construction shall be determined by the District to meet the needs of taxpayers within its boundaries.

  • Phasing of construction should be discussed now, as it will impact the overall design of the project and the future of existing businesses.

  • Phasing of construction is required to accommodate the entirety of the works and GCC has switched the order of Byres Road Public Realm Phasing, with the southern element presenting first.

  • Erosion and sedimentationcontrols will include both non-structural BMPs and structural BMPs. Non-structural BMPs to be employed at the project site include: • Minimizing disturbance;• Phasing of construction operations; and• Maintaining good housekeeping practices.

  • Phasing of construction of the Improvements under traffic shall be subject to approval by the Parties, which approval shall not be unreasonably withheld, conditioned, or delayed.

  • Erosion and sedimentation controls will include both non-structural BMPs and structural BMPs. Non-structural BMPs to be employed at the project site include: • Minimizing disturbance;• Phasing of construction operations; and• Maintaining good housekeeping practices.

  • Phasing of construction within a PUD may be permitted, provided that each individual phase is designed and developed to exist as an independent unit, and that the construction and improvement of common open space and site amenities shown on the development plan proceed at the same rate as the construction of dwellings and other permitted land uses.

  • Phasing of construction involves stabilizing one part of the site before disturbing another.

  • Phasing of construction is one of the flexible responses to changing conditions at the time of need.

  • AEN EE271 Lecture 5 7 - Bubbles When some inputs are inverted and others are not, choose the symbol that represents how you think about the function.

Related to Phasing of construction

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Scheduled Construction Period means the period commencing from the Appointed Date and ending on Scheduled Completion Date;

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Construction and demolition waste means waste from building materials, debris and rubble resulting from construction, remodeling, repair and demolition operations;

  • Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.